陆志浩, 吴建, 周宏, 熊雄. 2016: 浅谈灌注桩抗拔试验中桩身裂缝防治措施. 工程地质学报, 24(s1): 233-238. DOI: 10.13544/j.cnki.jeg.2016.s1.036
    引用本文: 陆志浩, 吴建, 周宏, 熊雄. 2016: 浅谈灌注桩抗拔试验中桩身裂缝防治措施. 工程地质学报, 24(s1): 233-238. DOI: 10.13544/j.cnki.jeg.2016.s1.036
    LU Zhihao, WU Jian, ZHOU Hong, XIONG Xiong. 2016: DISCUSSION ON THE CONTROL OF CRACKS IN THE ANTI-PULLING TEST OF FILLING PILE. JOURNAL OF ENGINEERING GEOLOGY, 24(s1): 233-238. DOI: 10.13544/j.cnki.jeg.2016.s1.036
    Citation: LU Zhihao, WU Jian, ZHOU Hong, XIONG Xiong. 2016: DISCUSSION ON THE CONTROL OF CRACKS IN THE ANTI-PULLING TEST OF FILLING PILE. JOURNAL OF ENGINEERING GEOLOGY, 24(s1): 233-238. DOI: 10.13544/j.cnki.jeg.2016.s1.036

    浅谈灌注桩抗拔试验中桩身裂缝防治措施

    DISCUSSION ON THE CONTROL OF CRACKS IN THE ANTI-PULLING TEST OF FILLING PILE

    • 摘要: 针对灌注桩抗拔试验过程中出现裂缝的问题,以山东某新建换流站试桩工程为例,研究了灌注桩裂缝产生的过程、裂缝缝宽的变化规律以及裂缝的分布范围,在此基础上分析了裂缝产生的原因,最后提出了相应的防治措施,以供类似工程进行借鉴。

       

      Abstract: According to the problem of cracks in the anti-pulling test of filling pile, using the pile test of a new convertor station in Shandong province as an example, the process of cracks, the variation of cracks' width and the distribution of cracks is studied. Based on that, the causes of cracks are presented. Then the corresponding prevention measures are suggested, which can be referred by similar projects.

       

    /

    返回文章