刘波, 苏培东, 邱鹏, 李作兵. 2016: 高边坡抗滑桩越顶问题的数值模拟. 工程地质学报, 24(s1): 940-946. DOI: 10.13544/j.cnki.jeg.2016.s1.136
    引用本文: 刘波, 苏培东, 邱鹏, 李作兵. 2016: 高边坡抗滑桩越顶问题的数值模拟. 工程地质学报, 24(s1): 940-946. DOI: 10.13544/j.cnki.jeg.2016.s1.136
    LIU Bo, SU Peidong, QIU Peng, LI Zuobin. 2016: NUMERICAL SIMULATION OF THE ANTI-SLIDE PILE OVERTOPPING OF HIGH SLOPE. JOURNAL OF ENGINEERING GEOLOGY, 24(s1): 940-946. DOI: 10.13544/j.cnki.jeg.2016.s1.136
    Citation: LIU Bo, SU Peidong, QIU Peng, LI Zuobin. 2016: NUMERICAL SIMULATION OF THE ANTI-SLIDE PILE OVERTOPPING OF HIGH SLOPE. JOURNAL OF ENGINEERING GEOLOGY, 24(s1): 940-946. DOI: 10.13544/j.cnki.jeg.2016.s1.136

    高边坡抗滑桩越顶问题的数值模拟

    NUMERICAL SIMULATION OF THE ANTI-SLIDE PILE OVERTOPPING OF HIGH SLOPE

    • 摘要: 越顶现象在实际工程中时有发生,但目前其计算理论却非常不成熟,计算过程中的很多问题都依赖于人为假设。以四川成龙一号滑坡为例,运用FLAC3D模拟滑坡在动态变形中坡体内的应力场、位移、剪应变增量及塑性区分布特征的变化,并利用强度折减法计算其稳定性,研究高边坡在降雨工况下抗滑桩越顶失效的机制,并对抗滑桩的合理位置进行试算。研究结果表明:(1)成龙一号滑坡在设置抗滑桩前有一潜在滑面,设桩支挡后在桩顶产生新的剪切滑面,发生越顶现象;(2)高边坡抗滑桩是否发生越顶失效受抗滑桩位置控制,当增大抗滑桩的高度并将其设于滑面剪出口位置时,能充分发挥桩的抗滑能力,并有效防止越顶现象的发生。现场监测数据也同时验证了FLAC3D数值模拟结果的可靠性,表明该方法适合越顶分析,可以在岩土研究领域推广运用。

       

      Abstract: The phenomenon of the sliding face cross over the anti-siding pile has often occurred in the actual engineering, but at present its calculation theory is not mature at all, and many problems in the calculation process are dependent on artificial hypothesis. The Chenglongyihao landslide of Sichuan As an example, the author using FLAC3D to simulate the variation of the stress field, displacement, shear strain increment and distribution characteristics of the plastic zone of the landslide in the dynamic deformation, and calculate the stability by using strength reduction method. Besides, the author has also studied the mechanism of the Sliding Face Cross over the Anti-side pile of high slope under rainfall condition, and tried to solve the reasonable position of anti-sliding pile. The results show that:(1) There is a potential slip surface in Chenglong landslide before setting anti-sliding pile. After setting pile, the landeslide generate new shear surface on the top of piles and will cross over the anti-slide pile; (2) the failure of the sliding face cross over the anti-slide pile of high slope was controlled by the position of anti-sliding pile. The increasement of anti-sliding piles height and when the piles were arranged on the position of the shear outlet of the sliding surface, the ability of anti-sliding can be full used, in addition, which can prevent occurrence of the phenomenon of the sliding face cross over the anti-siding pile effectively. The reliability of FLAC3D numerical simulation results is verified by the field monitoring data, which indicates that the method is suitable for the analysis of overtopping, and can be popularized in the field of rock and soil research.

       

    /

    返回文章
    返回