某水封油库底部灌浆措施优化研究

    OPTIMIZATION OF GROUTING MEASURES AT THE BOTTOM OF A WATER-SEALED OIL STORAGE CAVERN

    • 摘要: 地下水封洞库的渗流场控制对于洞库的施工和运行非常重要,对围岩进行灌浆处理,减小洞周围岩整体渗透系数是最直接有效的工程处理措施。针对某水封油库在施工过程中出现的部分洞室段涌水量过大的情况,提出了一种利用二维渗流数值计算结果快速估算三维洞室整体涌水量的方法,并分析洞室在人工水幕条件下、不同的底部灌浆处理方案下洞室的涌水量,提出油库底部灌浆的优化措施。结果表明:从减少涌水量效果的角度,对底板整体灌浆5 m的方案效果最好,底板整体灌浆的渗透系数可以根据工程对渗水量控制的需求适当调整。从节约灌浆成本的角度,对洞室底部两侧进行12 m深度以上的帷幕灌浆的方案可以达到较好效果。综合考虑到工程成本和减少涌水量效果,可以选择优化方案3,即渗透系数为10 Lu的洞室段取底板整体灌浆5 m的措施,而渗透系数为1 Lu的洞室段仅对两侧进行大于12 m深度的帷幕灌浆。本文结论可为类似工程提供参考。

       

      Abstract: The control of the seepage field of the water-sealed cavern is important for the construction and operation of the cavern. Grouting treatment of the surrounding rock to derecrease the overall permeability coefficient of the rock around the cave is the most direct and effective engineering treatment. To deal with the excessive discharge water in some sections of the cavern of water-sealed oil cavern during the construction, a method for estimating the overall water inflow of the three-dimensional cavern using numerical calculation results of two-dimensional seepage analysis is proposed. Then, the method is adopted to analyze the amount of water in the cavern under different grouting treatment schemes under the conditions of artificial water curtain. Finally, the optimization measures of grouting at the bottom of the oil cavern are proposed. The results show that the scheme of 5 m-grouting to the whole floor is the best method from the perspective of the effect of reducing discharge water. The target permeability coefficient of the grouting can be adjusted according to the demand of the project for the control of seepage quantity. From the perspective of economy, the scheme of curtain grouting more than 12 m-depth on both sides of the bottom of the cavern can achieve good results. Considering the engineering cost and the effect of reducing the water inflow, the optimization scheme 3 can be selected, that is,the sections of the cavern with a permeability coefficient of 10 Lu have the treatment of the 5 m whole grouting, and the sections with the permeability coefficient of 1 Lu have only curtain grouting on both sides of the bottom, with the depth greater than 12 m. The conclusions of this study can provide a reference for similar projects.

       

    /

    返回文章
    返回