GPS自动化监测技术在接娘坪变形体中的应用

刘韬 徐湘涛 陈世昌

刘韬, 徐湘涛, 陈世昌. 2014: GPS自动化监测技术在接娘坪变形体中的应用. 工程地质学报, 22(3): 428-435. doi: 10.13544/j.cnki.jeg.2014.03.011
引用本文: 刘韬, 徐湘涛, 陈世昌. 2014: GPS自动化监测技术在接娘坪变形体中的应用. 工程地质学报, 22(3): 428-435. doi: 10.13544/j.cnki.jeg.2014.03.011
LIU Tao, XU Xiangtao, CHEN Shichang. 2014: APPLICATION OF GPS AUTO-MONITORING TECHNOLOGY TO DEFORMATION BODY OF JIENIANGPING. JOURNAL OF ENGINEERING GEOLOGY, 22(3): 428-435. doi: 10.13544/j.cnki.jeg.2014.03.011
Citation: LIU Tao, XU Xiangtao, CHEN Shichang. 2014: APPLICATION OF GPS AUTO-MONITORING TECHNOLOGY TO DEFORMATION BODY OF JIENIANGPING. JOURNAL OF ENGINEERING GEOLOGY, 22(3): 428-435. doi: 10.13544/j.cnki.jeg.2014.03.011

GPS自动化监测技术在接娘坪变形体中的应用

doi: 10.13544/j.cnki.jeg.2014.03.011
基金项目: 

贵州省地质灾害监测预警与决策支持平台研究

详细信息
    作者简介:

    刘韬,男,硕士,主要从事地质灾害监测方面的工作.Email:276754447@qq.com

  • 中图分类号: P288.4

APPLICATION OF GPS AUTO-MONITORING TECHNOLOGY TO DEFORMATION BODY OF JIENIANGPING

  • 摘要: 接娘坪变形体位于贵州省都匀市,鉴于该地区的严重变形和可能失稳造成的严重后果,决定对该地区的变形进行监测。通过对该类型变形体监测预警指标的探讨,结合国内相关项目的经验和该地区的地形地貌等条件,选择了基于GPS的自动化监测技术,并辅以表面裂缝监测和降雨量监测。通过对该项目的建设,介绍了自动监测系统的组成与设计,并对一机多天线的技术进行了明确的阐述。通过表面裂缝和表面位移监测数据的对比,在一定程度上进一步印证了GPS在该项目的适用性。自2013年3月至今,该系统的监测结果显示监测点累计变形和沉降量最大的点都位于G2号监测站上,且4个监测点的平面变形方向都向煤矿集中开采的南西向,这反映了该坡体的变形主要是与山体下部煤矿开采有关,与当地降雨量的关系不明显。
  • [1] 刘彦杰, 付庆伟,倪自强.GPS一机多天线滑坡监测系统的建立和应用[J].人民长江, 2012, 44 (15): 52~53.Liu Yanjie, Fu Qingwei, Ni Ziqiang.Establishment and application of landslide monitoring system using GPS of single instrument with multi—antennas.Yangtze River, 2012, 44 (15): 52~53.

    [2] 付崇江, 张斌,朱云,等.GPS技术在三峡库区云阳县滑坡监测中的应用[J].重庆交通大学学报(自然科学版), 2011, 30 (增1): 538~540.Fu Chongjiang, Zhang Bin, Zhu Yun, et al.Monitoring and analyzing with GPS technology of landslides in Yunyang of Three Gorges Reservoir.Journal of Chongqing Jiaotong Unicersity(Natural Science), 2011, 30 (S1): 538~540.

    [3] 高帅, 二滩水电站库区金龙山斜坡稳定性监测的自动化改造技术研究[D].成都:成都理工大学, 2013.Gao Shuai.Automation Technology Study on Slope Stability Monitoring of Ertan Hydropower Station Reservoir Area of Jinlongshan.Chengdu: Chengdu University of Technology, 2013.

    [4] 过静珺, 杨久龙,丁志刚,等.GPS在滑坡监测中的应用研究─以四川雅安峡口滑坡为例[J].地质力学学报, 2004, 10 (1): 65~70.Guo Jingjun, Yang Jiulong, Ding Zhigang, et al.GPS application in landslide monitoring—A case study of the Xiakou landslide, Ya'an, Sichuan.Journal of Geomechanics, 2004, 10 (1): 65~70.

    [5] 张小红, 李征航,李振洪.隔河岩大坝外观变形GPS自动化监测系统的灵敏度分析[J].测绘通报, 2000, (11): 10~11.Zhang Xiaohong, Li Zhenghang, Li Zhenhong.GPS sensitivity analysis applied to the automatic monitoring system of Geheyan dam deformation.Bulletin of Surveying and Mapping, 2000, (11): 10~11.

    [6] 徐绍铨,程温鸣,黄学斌,等.GPS用于三峡库区滑坡监测的研究[J].水利学报, 2003, (1): 114~118.Xu Shaoquan, Cheng Wenming, Huang Xuebin, et al.The investigation of the landslides monitoring in the Three Gorges reservoir region by applying GPS.Journal of Hydraulic Engineering, 2003, (1): 114~118.

    [7] 王培建.龙羊峡水电站近坝库岸GPS滑坡监测[J].青海电力, 2003, (2): 46~48, 58.Wang Peijian.GPS coast supervision of near dam reservoir bank.Qinghai Electric Power, 2003, (2): 46~48, 58.

    [8] 张晨艳, 何秀凤,贾东振.瀑布沟水电站移民新城变形监测与预测分析[J].测绘科学技术学报, 2012, 29 (6): 422~426.Zhang Chenyan, He Xiufeng, Jia Dongzhen.Prediction and deformation of Pubugou hydropower engineering resettlement.Journal of Geomatics Science and Technology, 2011, 29 (6):422~426.

    [9] 过静珺, 李冬航,周百胜,等.四川雅安滑坡自动化远程监测系统示范工程[J].测绘通报, 2006, (4): 54~57.Guo Jingjun, Li Donghang, Zhou Baisheng, et al.A demonstrative automatic landslide monitoring system in Ya'an Sichuan.Bulletin of Surveying and Mapping, 2006, (4): 54~57.

    [10] 陈世昌.贵州省都匀市马达岭地灾群的自动化监测技术研究[D].成都:成都理工大学, 2013.Chen Shichang.Duyun City of Guizhou Province Madalin to Disaster Monitoring Automation Technology Group Study.Chengdu: Chengdu University of Technology, 2013.

    [11] 温铭生, 王连俊,李铁锋,等.基于实时监测的河口糖厂滑坡监测系统研究[J].工程地质学报, 2011, 19 (1): 76~82.Wen Mingsheng, Wang Lianjun, Li Tiefeng, et al.Real-time monitoring based landslide monitoring system at Hekou sugar refinery factory.Journal of Engineering Geology, 2011, 19 (1): 76~82.

    [12] DZ/T 0221-2006 崩塌滑坡泥石流监测规范[S].北京:中国标准出版社, 2006.DZ/T 0221-2006 Monitoring Specification Collapse Landslide Mud-Rock Flow.Beijing: Standards Press of China, 2006.

    [13] 张清志, 郑万模,巴仁基,等.应用高精度GPS系统对四川丹巴哑喀则变形体进行监测及稳定性分析[J].工程地质学报, 2013, 21 (2): 250~259.Zhang Qingzhi, Zheng Wanmo, Ba Renji, et al.Highly precise GPS monitoring devices for stability analysis of Yakaze landslide, Danba, Sichuan-based on.Journal of Engineering Geology, 2013, 21 (2): 250~259.

    [14] CH/T 2008-2005 全球导航卫星系统连续运行参考站网建设规范[S].北京:测绘出版社, 2006.CH/T 2008-2005 Specification for Construction of Continuously Operating Reference Station Using Global Navigation Satellite Systems.Beijing: Surveying and Mapping Press, 2006.

    [15] GB/T18314-2009 全球定位系统测量规范[S].北京:中国标准出版社, 2009.GB/T18314-2009 Global Positioning System Measurement Code.Beijing: Standards Press of China, 2009.

    [16] CJJ/T73-2010 卫星定位城市测量规范[S].北京:中国建筑工业出版社, 2010.CJJ/T73-2010 Specifications for the Satellite Positioning Cities.Beijing: China Architecture and Building Press, 2010.

    [17] 王利,张勤,赵超英,等.GPS一机多天线技术在公路边坡灾害监测中的应用研究[J].公路交通科技, 2005, 22 (6): 163~166.Wang Li, Zhang Qin, Zhao Chaoying, et al.The application study of GPS multi-antenna monitoring technique in the monitoring of road slope disaster.Journal of Highway and Transportation Research and Development, 2005, 22 (6): 163~166.

    [18] Ding X L,Chen Y Q,Huang D F,et al.Slope monitoring using GPS:A multi-antenna approach[J].GPS World, 2000, (3): 52~55.

    [19] GB50057-94 建筑物防雷设计规范[S].北京:中国计划出版社, 2011.GB50057-94 Code for Protection of Structures Against Lightning[S].Beijing: China Planning Press, 2011.
  • 加载中
计量
  • 文章访问数:  2927
  • HTML全文浏览量:  98
  • PDF下载量:  576
  • 被引次数: 0
出版历程
  • 收稿日期:  2014-04-29
  • 修回日期:  2014-05-05
  • 刊出日期:  2014-06-25