罗通坝对沟泥石流运移特征及桥梁危害性模型试验分析

    MODEL EXPERIMENTAL ANALYSIS OF DEBRIS FLOW MOVEMENT CHARACTERISTICS AND BRIDGE HAZARDS IN THE LUOTONGBA-DUIGOU

    • 摘要: 罗通坝对沟泥石流沟位于四川省绵阳市平武县,该沟曾暴发过泥石流,大量泥石流沉积物沿沟谷汹涌而下,对国道G247及新建九绵高速公路安全运营构成严峻威胁。对此,本文基于现场调查资料及无人机航拍,分析了其发育条件和特征,结合物理模型试验及数值分析方法,还原了泥石流运动及冲击桥墩过程,阐明了泥石流运移特征及桥梁冲击特性。研究表明该沟物源总量约为2.2641×106 m3,泥石流容重为1.40~1.68 t·m-3,洪峰流量为85.39~309.99 m3·s-1,一次冲出量约1.15×105 m3,为大型泥石流。在10年一遇暴雨条件下,泥石流冲过堵溃区后约10 min将到达沟口堆积区,对沟口桥墩等建筑设施造成冲击。物理模型试验表明,泥石流流体对桥墩的冲击集中在桥墩底部,冲击力随桥墩与沟口距离及桥墩高度增加而迅速衰减,离沟口较远的桥墩将受到多轮较强冲击。冲击模拟分析表明,泥石流在冲击桥墩的过程中,流体将桥墩全部包裹后会出现绕流爬升现象,最大主应力和主应变均出现在桥墩底部,分别为0.81 MPa和2.18×10-5 m·m-1,桥墩所受压强在其表面呈半椭圆环状分布,沿桥墩发生自下而上传导,造成墩顶结构产生0.33 mm位移。故建议工程中加强桥墩底部对泥石流冲击的防护设计,尽量避免泥石流对桥墩产生直接冲击,研究结果可为地区泥石流防治工作提供有益参考。

       

      Abstract: The Luotongba-Duigou debris flow in Pingwu County, Mianyang City, Sichuan Province, poses significant risks to infrastructure safety following a recent large-scale event that transported substantial sediments downstream, endangering National Highway G247 and the newly constructed Jiuzhaigou-Mianyang Expressway. This study combined field investigations with UAV aerial surveys to analyze the formation conditions and characteristics of the debris flow. Through physical model experiments and numerical simulations, the dynamics of debris flow movement and its impact on bridge piers were reconstructed. Results indicate that the total source material volume is approximately 2.2641×106 m3,with a density range of 1.40~1.68 t·m-3 and peak discharge between 85.39 m3·s-1 and 309.99 m3·s-1,classifying it as a large-scale dilute valley-type debris flow. Under a 10-year return period rainstorm scenario, the debris flow reaches the accumulation zone at the gully mouth about 10 minutes after breaching the blockage area, threatening bridge piers and other structures. Physical modeling shows that impact forces concentrate at the pier base and attenuate rapidly with increasing distance from the debris flow outlet and pier height. Piers located farther from the outlet may experience multi-phase strong impacts during debris flow events. Numerical simulations reveal that the debris flow fully envelops the pier upon impact, exhibiting circumferential climbing flow. The maximum principal stress (0.81 MPa) and principal strain (2.18×10-5 m·m-1) are concentrated at the pier base, with surface pressure distributed in a semi-elliptical pattern propagating upward and inducing a top displacement of 0.33 mm. For engineering practice, it is essential to reinforce pier bases against debris flow impacts and avoid direct collision between flow-transported debris and piers. These findings provide actionable insights for debris flow risk mitigation and support structural safety and disaster resilience planning in the region.

       

    /

    返回文章
    返回