高应力软岩巷道孔-槽复合卸压机理与工程应用效果研究

    STUDY ON THE MECHANISM AND ENGINEERING APPLICATION EFFECT OF HOLT-SLOT COMPOSITE PRESSURE RELIEF IN HIGH-STRESS SOFT ROCK ROADWAY

    • 摘要: 针对深部构造-自重耦合高地应力软岩地层中,传统大直径钻孔卸压存在岩体塑性流变塌孔、动力地质灾害防控效率不足的工程地质难题,本文提出了一种改进的孔-槽复合卸压结构。采用连续-离散元数值方法(FDEM)系统揭示0°~90°不同卸压槽倾角下高地应力煤岩体的地质力学响应、卸压断裂演化、储能与耗散能量地质演化规律,最后以某煤矿800 m级深部冲击倾向性巷道开展工程地质验证。结果表明:卸压槽倾角是控制岩体卸压损伤分区、动力灾害风险的核心地质参数,45°为最优倾角。同时卸压槽的方向并不会改变复合卸压结构的整体卸压特征。该工况下单轴抗压强度为17.41 MPa,较仅含卸压孔降低23.03%,最终裂纹密度为74.82 m-1。加载结束时仅存在小范围弹性应力区。峰值应力之后,孔间裂纹聚合且分布集中,保证了卸压期间岩体的完整性。能量演化方面,45°倾角下Esmax和Edmax分别为557 J和516 J,实现能量积聚与耗散的动态平衡。现场监测结果显示,采用45°孔-槽复合卸压方案后,巷道两帮和顶底板移近量降幅分别为37.10%和33.33%,巷道未出现大范围片帮、冒顶等典型岩体失稳现象。孔-槽复合卸压结构依靠钻孔与割缝槽协同卸压作用,可在不改变现有支护体系的前提下替代常规大直径钻孔卸压,实现岩体分时序卸压损伤演化与围岩长期承载地质性能匹配。研究结果可为深部高地应力地层冲击地压动力地质灾害防治提供理论依据与技术方案。

       

      Abstract: To address the engineering geological challenges associated with the plastic rheological collapse of rock masses and the insufficient dynamic disaster prevention efficiency of traditional large-diameter borehole pressure relief in deep structural-gravity coupling high in-situ stress soft rock strata, this study proposes an improved hole-slot composite pressure relief structure. The Finite Discrete Element Method(FDEM)is utilized to systematically investigate the geomechanical responses of high stress coal-rock masses, the evolution of unloading fracturing, and the geological evolution laws governing energy storage and dissipation under varying pressure relief groove inclination angles ranging from 0°to 90°. Field validation is performed in an 800 m deep rockburst-prone roadway. The results indicate that the inclination angle of the pressure relief groove is a critical geological parameter influencing the zonal unloading damage of the rock mass and the risk of dynamic disasters, with 45°identified as the optimal angle. Simultaneously, the direction of the pressure relief slot does not change the overall pressure relief characteristics of the composite pressure relief structure. Under this condition, the uniaxial compressive strength is measured at 17.41 MPa, which is 23.03% lower than that observed with pressure relief holes alone, and the final crack density is recorded at 74.82 m-1. At the conclusion of loading, only a minor elastic stress zone remains. Following the peak stress, cracks between the holes coalesced and became concentratedly distributed, thereby ensuring the integrity of the rock mass during the pressure relief phase. In terms of energy evolution, at a dip angle of 45°, the maximum energy accumulation(Esmax)and maximum energy dissipation(Edmax)were recorded at 557 J and 516 J, respectively, indicating a dynamic equilibrium between energy accumulation and dissipation. Results from field monitoring reveal that after implementing the 45°hole-groove composite pressure relief scheme, the convergence of the two sides, as well as the roof and floor of the roadway, decreased by 37.10% and 33.33%, respectively. Notably, no typical rock mass instability phenomena, such as large-scale spalling or roof falls, were observed in the roadway. The hole-slot composite unloading structure leverages the synergistic unloading effects of drilling and slotting to facilitate a time-phased evolution of unloading damage in the rock mass, aligning with the long-term load-bearing geological performance of the surrounding rock. This approach provides both a theoretical foundation and engineering geological technical solutions for preventing dynamic geological disasters, such as rockbursts in deep high-stress strata.

       

    /

    返回文章
    返回