Abstract:
To address the engineering geological challenges associated with the plastic rheological collapse of rock masses and the insufficient dynamic disaster prevention efficiency of traditional large-diameter borehole pressure relief in deep structural-gravity coupling high in-situ stress soft rock strata, this study proposes an improved hole-slot composite pressure relief structure. The Finite Discrete Element Method(FDEM)is utilized to systematically investigate the geomechanical responses of high stress coal-rock masses, the evolution of unloading fracturing, and the geological evolution laws governing energy storage and dissipation under varying pressure relief groove inclination angles ranging from 0°to 90°. Field validation is performed in an 800 m deep rockburst-prone roadway. The results indicate that the inclination angle of the pressure relief groove is a critical geological parameter influencing the zonal unloading damage of the rock mass and the risk of dynamic disasters, with 45°identified as the optimal angle. Simultaneously, the direction of the pressure relief slot does not change the overall pressure relief characteristics of the composite pressure relief structure. Under this condition, the uniaxial compressive strength is measured at 17.41 MPa, which is 23.03% lower than that observed with pressure relief holes alone, and the final crack density is recorded at 74.82 m
-1. At the conclusion of loading, only a minor elastic stress zone remains. Following the peak stress, cracks between the holes coalesced and became concentratedly distributed, thereby ensuring the integrity of the rock mass during the pressure relief phase. In terms of energy evolution, at a dip angle of 45°, the maximum energy accumulation(
Esmax)and maximum energy dissipation(
Edmax)were recorded at 557 J and 516 J, respectively, indicating a dynamic equilibrium between energy accumulation and dissipation. Results from field monitoring reveal that after implementing the 45°hole-groove composite pressure relief scheme, the convergence of the two sides, as well as the roof and floor of the roadway, decreased by 37.10% and 33.33%, respectively. Notably, no typical rock mass instability phenomena, such as large-scale spalling or roof falls, were observed in the roadway. The hole-slot composite unloading structure leverages the synergistic unloading effects of drilling and slotting to facilitate a time-phased evolution of unloading damage in the rock mass, aligning with the long-term load-bearing geological performance of the surrounding rock. This approach provides both a theoretical foundation and engineering geological technical solutions for preventing dynamic geological disasters, such as rockbursts in deep high-stress strata.