[1] 刘正雄. 岩爆预防及防治技术研究[J].中国铁道科学, 2001, 22 (4): 74~76. Liu Zhengxiong.Technical study on the prevention and cure of rockburst.China Railway Science, 2001, 22 (4): 74~76.[2] 杨涛, 李国维.基于先验知识的岩爆预测研究[J].岩石力学与工程学报, 2000,l 9 (4): 429~431. Yang Tao,Li Guowei.Study on rockburst prediction method based on the prior knowledge.Chinese Journal of Rock Mechanics and Engineering, 2000, 19 (4): 429~431.[3] 杨涛, 沈培良.基于人工神经网络的岩爆烈度预测研究[J].公路交通科技, 2004, 121 (17): 30~32. Yang Tao,Shen Peiliang.Study on rockburst intensity prediction method based On neural network theory.Journal of Highway and Transportation Research and Development, 2004, 121 (17): 30~32.[4] 陶振宇. 高地应力区的岩爆及其判别[J].人民长江, 1987,(5): 25~32. Tao Zhenyu.Rockburst and estimation in high stress area.Renmin Changjiang River, 1987,(5): 25~32.[5] Hoek E Brown E T.Underground Excavation in Rock.London Institute of Mining and Metallurgy, 1980.[6] Kidybinski A.Bursting liability indices of coa1.International Journal Rock Mechanics Mining Science and Geomechanics.Abstract, 1981, 18 (4): 295~304.[7] 王元汉, 李卧东,李启光.岩爆预测的模糊数学综合评判法[J].岩石力学与工程学报, 1998, 17 (5): 493~501. Wang Yuanhan,Li Wodong,Li Qiguang.Comprehensive method for estimating rockburst with FUZZY.Chinese Journal of Rock Mechanics and Engineering, 1998, 17 (5): 493~501.[8] 杨健, 武雄.岩爆综合预测评价方法[J].岩石力学与工程学报, 2005, 24 (3): 411~416. Yang Jian,Wu Xiong.Comprehensive forecasting method for estimating rockburst.Chinese Journal of Rock Mechanics and Engineering, 2005, 24 (3): 411~416.[9] 孙海涛, 杨挺拔,丁德馨.基于非线性混沌理论的岩爆预测方法分析[J].矿冶, 2005, 14 (1): 16~19. Sun Haitao,Yang Tingba,Ding Dexin.Approach to prediction of rock burst based on non-linear chaos theory.Mining & Metallurgy, 2005, 14 (1): 16~19.[10] 陈海军, 郦能惠,聂德新,尚岳全.岩爆预测的人工神经网络模型[J].岩土工程学报, 2002, 24 (2): 229~232. Chen Haijan,Li Nenghui,Nie dexin.A model for prediction of rockburst by artificial neural network.Chinese Journal of Geotechnical Engineering, 2002, 24 (2): 229~232.[11] 姜彤, 黄志全,赵彦彦.动态权重灰色归类模型在南水北调西线工程岩爆风险评估中的应用[J].岩石力学与工程学报, 2004, 23 (7): 1104~1108. Jiang Tong,Huang Zhiquan,Zhao Yanyan.Dynamically weighted grey optimization model for rockburst risk forecasting and its application to western route of south-north water transfer project.Chinese Journal of Rock Mechanics and Engineering, 2004, 23 (7): 1104~1108.[12] 赵洪波. 岩爆分类的支持向量机方法[J].岩土力学, 2005, 26 (4): 642~644. Zhao Hongbo.Classification of rockburst using support vector machine.Rock and Soil mechanics, 2005, 26 (4): 642~644.[13] 冯夏庭, 赵洪波.岩爆预测的支持向量机[J].东北大学学报(自然科学版), 2002, 23 (1): 57~59. Feng Xiating,Zhao Hongbo.Prediction of rockburst using support vector machine.Journal of Northeast University(Natural Science), 2002, 23 (1): 57~59.[14] 刘春, 易俊,姜德义等.基于灰色关联分析理论的岩爆烈度预测研究[J].中国矿业, 2007, 12 (12): 100~103. Liu Chun,Yi Jun,Jiang Deyi,et al.Study on rock burst intensity prediction method based on gray relational analysis theory.China Mining Magazine, 2007, 12 (12): 100~103.[15] 邓聚龙. 灰色系统理论教程[M].武汉:华中理工大学出版社, 1990. Deng Julong.Grey System Theory Teaching.Wuhan:Huazhong University of Science & Technology Press, 1990.[16] 刘思峰, 党耀国,方志耕,等.灰色系统理论及其应用[M].北京:科学出版社, 2000. Liu Sifeng,Dang Yaoguo,Fang Zhigeng,et al.Grey System Theory and Application.Beijing:Science Press, 2000.
|