[1] 地基处理手册(第二版) [M].北京:中国建筑工业出版社,2000,417~423.Foundation treatment manual(2thedition).China architecture and building press,2000,417~423.
[2] 唐贤强,谢瑛,谢树彬等.地基工程原位测试技术 [M].北京:中国铁道出版社,1993.Tang Xianqiang,Xie Ying,Xie Shubin.Technology of ground engineering in situ testing.Beijing:China railway publishing house,1993.
[3] 张云.一维地面沉降模型及其求解 [J].工程地质学报,2002,10(4):434~437.Zhang Yun.One-dimensional model for land subsidence and its solution.Journal of engineering Geology,2002,10(4):434~437.
[4] 史存林.软土路基工后沉降的控制试验研究报告 [R].铁道科学研究院铁道建筑研究所,2003,89~102.Shi Cunlin.Research report on control test of post-construction settlement in soft soil ground.Railway Engineering Research Institute,2003,89~102.
[5] 李子春.高速铁路软土地基沉降变形特性及典型处理方法比较试验研究报告 [R].铁道科学研究院铁道建筑研究所,2003,123~135.L i Zichun.Research report on deformation character and typ ical treatment comparative test of soft soil ground settlement in high-speed railway.Railway Engineering Research Institute,2003,123~135.
[6] 龚士良.上海软粘土微观特性及在土体变形与地面沉降中的作用研究 [J].工程地质学报,2002,10(4):378~384.Gong Shiliang.The m icroscop ic characteristic of Shanghai soft clay and its effect on soil mass deformation and land subsidence.Journal of engineering Geology,2002,10(4):378~384.
[7] 张诚厚,袁文明,戴济群.高速公路软基处理 [M].北京:中国建筑工业出版社,1997.Zhang Chenghou,Yuan W enm ing,Dai J iqun.Soft soil ground treatment in high-speed railway.Beijing:China architecture and building p ress,1997.
|