[1] 电力工业部中南勘测设计研究院.岩质高边坡稳定分析及处理技术在龙滩工程中应用(二)———左岸倾倒蠕变岩体B区边坡稳定与治理研究 [R],1995.M id-south Design&Research Institute for Hydroelectric Project,Power Industry Department.The app licationof rock high slope stability analysis and handing technology in the Longtan engineering(2)—the stability and harnessingresearch of creep ing rock slope Bin the left bank,1995.
[2] 中国科学院地质研究所,水电部中南勘测设计院.红水河龙滩坝址左岸倾倒蠕变体稳定性研究-综合报告 [R],1987.The Institute of Technology,CAS,and M id-south Design&Research Institute for Hydroelectric Project,W ater and Electricity Department.The stability research of left bank topp ling rock mass in the Longtan dam iste—synthesize report,1987.
[3] 王思敬,肖远.反倾向层状岩体弯曲倾倒变形破坏机理及其工程对策研究报告(一)、(二) [R],1993.W ang Sijing,Xiao Yuan.The study report about topp ling deformation and failure mechanism and its engineering measure of counter tendencybedded rock mass(1),(2),1993.
[4] 王思敬,肖远,杜永廉.广西红水河龙滩水电站坝址左岸边坡层状岩体弯曲蠕变机理分析 [J].地质科学(增刊),1992,342~352.W angSijing,Xiao Yuan,Du Yonglian.The mechanism of bending creep of bedded rock mass in the slope on the left bank of Longtan Dam iste [J].1992,Geologic Science(supp lement),342~352.
[5] 韩贝传,王思敬.边坡倾倒变形的形成机制与影响因素分析 [J].工程地质学报,1999,7(3):213~217.Han Beichuan,W ang Sijing.Mechanism for topp ling deformation of slope and analysis of influencing factors on it [J].Engineering Geological Journal,1999,7(3):213~217.
[6] 陈红旗,黄润秋.反倾层状边坡弯曲折断的应力及挠度判据 [J].工程地质学报,2004,12(3):243~246.Chen Hongqi,Huang Runqiu.Stress and flexibility criteria of bending and breaking in a countertendency layered slope.Joural of Engineering Geology,2004,12(3):243~246.
[7] 钟辉亚.岩质边坡工程的位移信息分析 [D].中国科学院地质研究所博士论文,1996.Zhong Huiya.The disp lacement information analysis of rock slope engineering,Doctor paper in the institute of geology,CAS,1996.
|