    水利工程信息模型:方法、框架与应用

    HYDROPOWER PROJECT INFORMATION MODEL: METHOD, FRAMEWORK AND APPLICATION

    • 摘要: 三维信息化模型是重大工程全生命周期建设的重要基础。然而,目前对于地质三维模型与建筑结构三维信息模型,通常由于数据结构问题难以统一,而且大部分停留在“可视化”,难以“可计算”、“可分析”。此外,由于地质条件的复杂性,在三维地质建模方面通常进行大量的简化。本文基于目前先进的三维建模技术,提出了三维精细化地质模型与建筑结构三维模型融合的建模方法,实现了三维地质模型的快速、精细化建模。所建立的模型,统一在*.stl、*.obj及*.igs等标准化三维模型文件下,可方便地用于不同场景的三维模型可视化、分析及后续数值计算模型网格划分等。针对大型水电工程建设提出了水利工程信息模型的框架,并将其应用于索风营水利工程,实现了大坝精细化BIM及4个堆积体的精细化三维地质模型(LIM)的融合与信息化管理。本文研究对于实现水电工程信息化管理、稳定性分析、潜在灾害评估和预测等具有重要的意义。

       

      Abstract: The 3D information model is the foundation of the whole life cycle management of the engineering projects. However,at present,the 3D geological model and the 3D information model of the projects are usually difficult to be unified due to the differences of data structure. Most of models only can be used for "visualization". They are difficult for "simulation" and "analyzation". In addition,due to the complexity of geological structures,a lot of simplifications are usually used in 3D geological modeling. Based on the advanced 3D modeling technology,this paper proposes a modeling method of 3D geological model and 3D model of building structure,realizing fast and refined modeling of 3D model. The established models are unified under standardized 3D model files such as*.stl,*.obj and*.igs,which can be conveniently used for 3D model visualization,analyzation and subsequent numerical simulation in different scenarios. For the construction of large hydropower projects,the framework of hydropower project information model(HIM) is proposed and applied to Suofengying Hydropower Project. The fromwork realizes the fusion and information of the BIM of the dam and the refined 3D geological model of the four landslides. The studies in this paper are of great significance for the realization of information management,stability analysis,potential disaster assessment and prediction of hydropower projects.

       

    /