胡剑崴, 胡建平, 张序琐. 2006: 破碎围岩洞口段隧道塌方防灾. 工程地质学报, 14(S1): 434-437.
    引用本文: 胡剑崴, 胡建平, 张序琐. 2006: 破碎围岩洞口段隧道塌方防灾. 工程地质学报, 14(S1): 434-437.
    HU Jianwei, HU Jianping, ZHANG Xusuo. 2006: DISASTER PROOF OF TUNNEL COLLAPSE IN THE ENTRANCE OF FRACTURE WALL ROCK. JOURNAL OF ENGINEERING GEOLOGY, 14(S1): 434-437.
    Citation: HU Jianwei, HU Jianping, ZHANG Xusuo. 2006: DISASTER PROOF OF TUNNEL COLLAPSE IN THE ENTRANCE OF FRACTURE WALL ROCK. JOURNAL OF ENGINEERING GEOLOGY, 14(S1): 434-437.

    破碎围岩洞口段隧道塌方防灾

    DISASTER PROOF OF TUNNEL COLLAPSE IN THE ENTRANCE OF FRACTURE WALL ROCK

    • 摘要: 通过对马鞍山隧道塌方地质调查,结合地表变形监测和地质雷达超前预报结果,分析了产生塌方的原因,总结了相似工程地质条件下,防治塌方事故发生的措施和对策,作为其他隧道施工的指导。

       

      Abstract: The cause of tunnel collapse is analyzed in this paper through the collapse geological investigation of Ma'anshan Tunnel, also the outcome of observation of ground deformation and pre-forecast result of geology radar are consulted to further study the cause. The measure and countermeasure to prevent the occurring of collapse accidents are generalized under the same engineering geological condition, which can provide construction direction for other tunnels.

       

    /

    返回文章
    返回