The Nanjing Deji Plaza(Phase 2)project is located at the center of Nanjing. Excavation depths of main building and attached building are 21.50m and 19.70m respectively. The excavation depth of the foundation pit is deep. The pit area is huge. This paper analyzes the project structure, engineering geological conditions, hydrogeology conditions, surrounding environment and especially protection of subway tunnel. Pit support structure adopts underground diaphragm wall with two walls joining together. The attached building is constructed with top-down method. The main building is constructed with down-top method. This paper has put forward the protection measures to subway tunnel. In addition, this paper uses the general finite element analysis software to calculate the influence to subway tunnel by foundation pit excavation. The results show that this project has little impact on surrounding environment using top-down method, and meets the requirement of tunnel deformation with metro operation. This paper has a certain guiding significance for the projects with top-down method.
Cao S W. 2007. A technique research of the reverse construction method on the high buildings[Thesis of Master][D]. Chengdu: Southwest Jiaotong University.Dai B B, Fan Q G, Zhao X H. 2005. A study on monitoring of up-down construction for deep excavation engineering[J]. Industrial Construction, 35 (9): 54~63.Fan Q G, Zhao X H. 2006. Theory and computation of up-down construction method for deep excavation engineerings[J]. Rock and Soil Mechanics, 27 (12): 2169~2176.Guan X M. 2008. Research on several techniques of big &deep foundation pit by top-down construction method[Thesis of Master][D]. Shanghai: Tongji University.Xie X S. 2007. Research on key technique and structure analysis of big & deep foundation pit by top-down construction method[Doctorate Thesis][D]. Shanghai: Tongji University.Zhang J X, Liao Q L. 2014. Application status and prospect of top-down method in deep foundation excavation construction[J]. Construction Technology, 43 (7): 1~5.曹少卫. 2007. 高层建筑逆作法施工技术研究[硕士学位论文][D].成都:西南交通大学.戴标兵,范庆国,赵锡宏. 2005. 深基坑工程逆作法的实测研究[J]. 工业建筑, 35 (9): 54~63.范庆国,赵锡宏. 2006. 深基坑工程逆作法的理论与计算[J]. 岩土力学, 27 (12): 2169~2176.关雪梅. 2008. 大型深基坑逆作法施工中的若干工艺技术问题研究[硕士学位论文][D].上海:同济大学.谢小松. 2007. 大型深基坑逆作法施工关键技术研究及结构分析[博士学位论文][D].上海:同济大学.张晋勋,廖秋林. 2014. 深基坑逆作法施工技术应用现状与展望[J]. 施工技术, 43 (7): 1~5.