叶龙珍, 柳侃, 黄瑛瑛, 朱涛. 2014: 福建省公路铁路建设的重大工程地质问题. 工程地质学报, 22(s1): 195-201. DOI: 10.13544/j.cnki.jeg.2014.s1.033
    引用本文: 叶龙珍, 柳侃, 黄瑛瑛, 朱涛. 2014: 福建省公路铁路建设的重大工程地质问题. 工程地质学报, 22(s1): 195-201. DOI: 10.13544/j.cnki.jeg.2014.s1.033
    Ye Longzhen, Liu Kan, Huang Yingying, Zhu Tao. 2014: THE MAJOR ENGINEERING GEOLOGICAL PROBLEMS OF RAILWAY AND HIGHWAY CONSTRUCTION IN FUJIAN PROVINCE. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 195-201. DOI: 10.13544/j.cnki.jeg.2014.s1.033
    Citation: Ye Longzhen, Liu Kan, Huang Yingying, Zhu Tao. 2014: THE MAJOR ENGINEERING GEOLOGICAL PROBLEMS OF RAILWAY AND HIGHWAY CONSTRUCTION IN FUJIAN PROVINCE. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 195-201. DOI: 10.13544/j.cnki.jeg.2014.s1.033

    福建省公路铁路建设的重大工程地质问题

    THE MAJOR ENGINEERING GEOLOGICAL PROBLEMS OF RAILWAY AND HIGHWAY CONSTRUCTION IN FUJIAN PROVINCE

    • 摘要: 基础设施建设,尤其公路铁路线性工程建设中易产生众多工程地质问题。前车之鉴,后事之师,通过对福建境内高速公路、国省道及铁路若干典型案例总结归纳,分析表明:福建公路铁路工程的主要重大工程地质问题包括滑坡(含古滑坡复活)、隧道突水、软土、特殊岩土体等。加强古滑坡前期辨识及系统勘测,实施监测反馈动态设计,加强立体排水及减载抗滑锚固支挡综合根治滑坡; 在前期全面勘测基础上,加强隧道施工期断裂构造、围岩裂隙及岩溶洞隙地质超前预报预警监测和防范,是预防隧道突水关键; 通过勘测揭示软土成因、立体分布及物理力学结构特性,针对性进行换填、排水固结、柔性桩、刚性桩以及桩-板、桩-筏、桩-网结构综合软土地基处理。

       

      Abstract: The highway and railway linear infrastructure construction will produce many engineering geological problems easily. The past, the future,by summarzing some typical cases of freeway, national and provincial highway and railway construction in Fujian, results show that:landslides(including ancient landslide resurrection),tunnel water inrush, soft soil are the major engineering geological problems of highway and railway engineering in Fujian province. Landslide problems are solved by strengthening the ancient landslide early identification and system survey, the implementation of dynamic design of monitoring feedback, and comprehensive treatment of three-dimensional drainage, load shedding and anti slip anchor retaining; Base on the comprehensive survey in the early stage, the key of prevention of water inrush in tunnel is early advance geological forecast warning monitoring and prevention of phase faults, rock fissures and karst caves in the tunnel construction; Through the survey reveals of the structure characteristics of the soft soil genesis, three-dimensional distribution and physical mechanics, the corresponding treatment are apllied in soft soil foundation of replacement, drainage consolidation, flexible pile, rigid pile, or structure of pile-plate, pile-raft and pile-net.

       

    /