潘玉珍, 朱振彪, 白文学, 徐俊杰. 2014: 金沙江乌东德水电站坝址河段地热异常特征与成因分析. 工程地质学报, 22(s1): 238-243. DOI: 10.13544/j.cnki.jeg.2014.s1.040
    引用本文: 潘玉珍, 朱振彪, 白文学, 徐俊杰. 2014: 金沙江乌东德水电站坝址河段地热异常特征与成因分析. 工程地质学报, 22(s1): 238-243. DOI: 10.13544/j.cnki.jeg.2014.s1.040
    Pan Yuzhen, Zhu Zhenbiao, Bai Wenxue, Xu Junjie. 2014: ANALYSIS ON GEOTHERMAL ANOMALY CHARACTERISTIC AND CAUSEES OF WUDONGDE HYDROPOWER STATION DAM SITE ON THE JINSHAJIANG RIVER. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 238-243. DOI: 10.13544/j.cnki.jeg.2014.s1.040
    Citation: Pan Yuzhen, Zhu Zhenbiao, Bai Wenxue, Xu Junjie. 2014: ANALYSIS ON GEOTHERMAL ANOMALY CHARACTERISTIC AND CAUSEES OF WUDONGDE HYDROPOWER STATION DAM SITE ON THE JINSHAJIANG RIVER. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 238-243. DOI: 10.13544/j.cnki.jeg.2014.s1.040

    金沙江乌东德水电站坝址河段地热异常特征与成因分析

    ANALYSIS ON GEOTHERMAL ANOMALY CHARACTERISTIC AND CAUSEES OF WUDONGDE HYDROPOWER STATION DAM SITE ON THE JINSHAJIANG RIVER

    • 摘要: 乌东德水电站坝址河段地热异常问题因涉及热水塘断层活动性、地下工程地质环境等而倍受各方关注,为此进行了专门地质调查和分析研究。认为:坝址河段地热异常与热水塘断层有关,但并非热水塘断层活动的证据; 沿断层分布的温泉属中-低温型,其形成源于特殊的地形地貌与地质结构,成因为(含水)地层-断层复合控制模式; 热水塘断层不属于工程活动断层,不影响邻近坝址的成立,但沿该断层发育的温泉与邻近地段地热异常有关,将对乌东德水电站地下工程施工带来不利,应采取适当工程措施处理。

       

      Abstract: The geothermal anomaly characteristics at Wudongde hydropower station dam site refer to the Reshuitang fault and the geological environment of underground engineering, so the special geological investigation and analysis were carried out. The results show that:geothermal anomaly is associated with the Reshuitang fault, but it was not the evidence for the Reshuitang fault activities; the hot spring distributed along the fault is classified as medium-low temperature type. The formation of those hot springs attributed to the special topography and geological structure, and the cause of those hot springs stratum-fault compound control mode. The Reshuitang fault is not a active fault, would not affect the adjacent dam site. Springs developed along faults are related with geothermal anomaly in adjacent areas will bring adverse impact on underground engineering construction. So, it should take appropriate engineering measures to ensure safety in the construction process.

       

    /