陈冬冬, 林金洪. 2016: 仙游抽水蓄能电站主要构造对工程设计的影响及处理措施. 工程地质学报, 24(s1): 324-330. DOI: 10.13544/j.cnki.jeg.2016.s1.048
    引用本文: 陈冬冬, 林金洪. 2016: 仙游抽水蓄能电站主要构造对工程设计的影响及处理措施. 工程地质学报, 24(s1): 324-330. DOI: 10.13544/j.cnki.jeg.2016.s1.048
    CHEN Dongdong, LIN Jinhong. 2016: XIANYOU PUMPED-STORAGE POWER STATION MAIN STRUCTURE'S INFLUENCE ON THE ENGINEERING DESIGN AND TREATMENT MEASURES. JOURNAL OF ENGINEERING GEOLOGY, 24(s1): 324-330. DOI: 10.13544/j.cnki.jeg.2016.s1.048
    Citation: CHEN Dongdong, LIN Jinhong. 2016: XIANYOU PUMPED-STORAGE POWER STATION MAIN STRUCTURE'S INFLUENCE ON THE ENGINEERING DESIGN AND TREATMENT MEASURES. JOURNAL OF ENGINEERING GEOLOGY, 24(s1): 324-330. DOI: 10.13544/j.cnki.jeg.2016.s1.048

    仙游抽水蓄能电站主要构造对工程设计的影响及处理措施

    XIANYOU PUMPED-STORAGE POWER STATION MAIN STRUCTURE'S INFLUENCE ON THE ENGINEERING DESIGN AND TREATMENT MEASURES

    • 摘要: 仙游抽水蓄能电站地质勘察工作从1993年9月开始,2013年12月电站4台机组全部投入商业运行,前后历时20多年,随着勘察工作的深化及工程开工建设开挖揭露情况,工程地质条件也逐渐明朗化,电站的设计工作根据现场揭露的工程地质条件亦进行了相关优化等,在提高工程安全性、稳定性上或降低工程的投资上都起到了相当作用。本文通过仙游抽水蓄能电站前期勘察阶段与施工阶段揭露的工程地质条件对比,针对现场揭露的工程地质条件,阐述相关的设计处理措施,对于类似工程具有借鉴作用。

       

      Abstract: The geological exploration work of Xianyou pumped storage power station began in 1993,September and until 2013,December four generating units was put into commercial operation, which took 20 years. With the development of exploration work and condition of engineering construction excavation, engineering geological conditions have gradually become clear. According to revealed engineering geological conditions in the scene, the design of the power station was optimized, which plays an important role in in the works to improve the security, stability or reduce engineering investment. In this paper, aimed at revealed engineering geological condition in the scene conditions, relevant measures in the design are expounded by the comparison in engineering geological conditions of early exploration stage and construction stage and it will be a reference for similar engineering.

       

    /

    返回文章
    返回