悬臂式桩板挡土墙在某边坡加固改造工程中的应用

    THE APPLICATION OF PILE-PLANK RETAINING WALL IN A SLOPE REINFORCEMENT PROJECT

    • 摘要: 某既有建筑边坡坡顶临近现状建筑物,坡顶需要外扩拓宽10m,为此需要增设挡土墙,对既有边坡进行加固改造。根据该工程的特殊地形、地质条件以及周边环境条件,设计采用变截面悬臂式桩板墙,桩后回填土采用水泥掺量10%的水泥土。监测结果表明,桩体深层水平位移、桩顶变形以及桩体钢筋内力均较小,都小于理论计算值,坡顶建筑物变形也很小,支护体系安全可靠。

       

      Abstract: A existing building is located on the slope crest. To increase the usable floor areas, the top edge of the slope needed to move outside for 10meters. The refore a retaining wall was demanded to reinforce the slope. According to the project's topographical, geological and surrounding environment conditions, variable cross-section pile-plank Retaining Wall was adopted. To control the displacement of the pile-top, cemented soil was used as backfill soil. The monitor results show that the deformation of the piles and the existing building on slope crest is quite small. The above monitor results prove that the supporting system is safe and reliable.

       

    /

    返回文章
    返回