陈满, 陈龙, 张世殊, 李廷友, 李辉, 赵小平. 2016: 川藏联网输变电线路工程地质灾害发育规律与特征研究. 工程地质学报, 24(s1): 1447-1453. DOI: 10.13544/j.cnki.jeg.2016.s1.214
    引用本文: 陈满, 陈龙, 张世殊, 李廷友, 李辉, 赵小平. 2016: 川藏联网输变电线路工程地质灾害发育规律与特征研究. 工程地质学报, 24(s1): 1447-1453. DOI: 10.13544/j.cnki.jeg.2016.s1.214
    CHEN Man, CHEN Long, ZHANG Shishu, LI Tingyou, LI Hui, ZHAO Xiaoping. 2016: STUDY ON THE DEVELOPMENT REGULARITY AND CHARACTERISTICS OF GEOLOGICAL HAZARD ALONG THE CHUAN-ZANG TRANSMISSION PROJECT. JOURNAL OF ENGINEERING GEOLOGY, 24(s1): 1447-1453. DOI: 10.13544/j.cnki.jeg.2016.s1.214
    Citation: CHEN Man, CHEN Long, ZHANG Shishu, LI Tingyou, LI Hui, ZHAO Xiaoping. 2016: STUDY ON THE DEVELOPMENT REGULARITY AND CHARACTERISTICS OF GEOLOGICAL HAZARD ALONG THE CHUAN-ZANG TRANSMISSION PROJECT. JOURNAL OF ENGINEERING GEOLOGY, 24(s1): 1447-1453. DOI: 10.13544/j.cnki.jeg.2016.s1.214

    川藏联网输变电线路工程地质灾害发育规律与特征研究

    STUDY ON THE DEVELOPMENT REGULARITY AND CHARACTERISTICS OF GEOLOGICAL HAZARD ALONG THE CHUAN-ZANG TRANSMISSION PROJECT

    • 摘要: 西藏昌都电网与四川电网联网输变电工程是迄今为止世界上最具建设挑战性的输变电工程之一,工程沿线地形地质条件极为复杂,地质灾害频发,地质灾害风险高。本文通过对川藏联网输变电工程沿线的地质灾害调查,分析研究了沿线地质灾害发育的规律及特征,评价了地质灾害对线路工程的影响,主要结论如下:川藏联网输变电工程沿线主要地质灾害类型有崩塌、滑坡、泥石流及不稳定斜坡等,其发育规律及特征主要与地形地貌、地层岩性有关;地质灾害对输变电线路工程的影响主要体现为对塔位及临时施工营地的影响,对危险性小的地质灾害点可采取跨越或加强巡视的措施,对危险性大的地质灾害宜避让,无法避让的应进行适当防护,并加强监测及巡视。通过对沿线地质灾害发育规律及特征研究,可以为输变电工程的选线、地灾防治等提供科学依据,具有重要的应用价值。

       

      Abstract: Changdu in Xizang and Sichuan(Chuan-Zang) power grid transmission project is One of the world's most challenging power grid transmission projects Construction so far, with extremely complex geological conditons, frequent and high risk geological hazards. In this paper, the geological hazards were investigated along the Chuan-Zang power grid transimission project line to analyze the regularity and characteristics of geologcial hazrad and evaluate the influent to the line project. The results from the study as follows: there are some typical geologcial hazards along the Chuan-Zang project line, such as collapse, slope, debris flow and unstable slope, which were concerned to the topography and lithology; the influent of geological hazards along the transimission project were reflected to the tower and construction camp, as the little risk geological hazards, the stride across and strengthen inspections could be used, as the high risk geological hazards, the tower and construction camp could be avoided or the stride across tower, otherwise appropriate support and strengthen inspections could be used. The scientific basis with important application value could be provided for the line selection and preventive meatures of transimission project base on the study of geologcial hazards along Chuan-Zang power grid project

       

    /

    返回文章
    返回