代国忠, 彭亮, 朱加, 李书进. 2017: 常州地铁潞城站主体基坑围护工程设计方案优选研究. 工程地质学报, 25(s1): 55-59. DOI: 10.13544/j.cnki.jeg.2017.s1.009
    引用本文: 代国忠, 彭亮, 朱加, 李书进. 2017: 常州地铁潞城站主体基坑围护工程设计方案优选研究. 工程地质学报, 25(s1): 55-59. DOI: 10.13544/j.cnki.jeg.2017.s1.009
    DAI Guozhong, PENG Liang, ZHU Jia, LI Shujin. 2017: RESEARCH ON THE DESIGNS OPTIMIZATION OF MAIN FOUNDATION PIT BRACING PROJECT OF LUCHENG STATION IN CHANGZHOU METRO TUNNEL. JOURNAL OF ENGINEERING GEOLOGY, 25(s1): 55-59. DOI: 10.13544/j.cnki.jeg.2017.s1.009
    Citation: DAI Guozhong, PENG Liang, ZHU Jia, LI Shujin. 2017: RESEARCH ON THE DESIGNS OPTIMIZATION OF MAIN FOUNDATION PIT BRACING PROJECT OF LUCHENG STATION IN CHANGZHOU METRO TUNNEL. JOURNAL OF ENGINEERING GEOLOGY, 25(s1): 55-59. DOI: 10.13544/j.cnki.jeg.2017.s1.009

    常州地铁潞城站主体基坑围护工程设计方案优选研究

    RESEARCH ON THE DESIGNS OPTIMIZATION OF MAIN FOUNDATION PIT BRACING PROJECT OF LUCHENG STATION IN CHANGZHOU METRO TUNNEL

    • 摘要: 常州市轨道交通2号线潞城站标准段基坑挖深约16.49m,东西端头井基坑分别深约17.72m和18.21m,基坑开挖坑侧土层主要为黏性土及粉质黏土。为实现技术上可行、经济上合理、实用安全、环保节能的设计理念,经优化设计与论证,决定车站主体基坑围护工程采用钻孔灌注桩多道内支撑的支护方案,基坑外侧采用三轴搅拌桩(高压线下方采用高压旋喷桩)止水,基坑内采用管井(疏干井、降压井)降水的措施。与地下连续墙(内支撑)支护相比,在相同的支护条件下,采用钻孔灌注桩的围护结构降低工程造价30%左右。工程实践证明本支护工程设计方案优选达到了预期目标。

       

      Abstract: The depth of excavation in standard section is about 16.49m, and the pit depth of the east and west ends of the well location is about 17.72m and 18.21m respectively, the main soil layer on the foundation pit is cohesive soil and silty clay in Lucheng Railway Station of Changzhou Metro 2. Bored pile with bracing retaining and protection plan was employed in subway station deep foundation excavation project through the optimization design and demonstration, for realizing the design ideas of feasible technology, economical, practical and safe, environment-friendly and fuel-efficient. Three-axis mixing pile(high pressure jet grouting pile is used under the high voltage line) waterproof wall is adopted outside the foundation, and the tube well precipitation(drainage well, decompression well) is utilized inside the foundation. Compared with the diaphragm wall(internal support),the retaining structure of bored pile can reduce the cost of construction by about 30%under the same support condition. The engineering practice proves that the design scheme of the support project has reached the expected goal.

       

    /