    峡谷高坝蓄水诱发近坝库盆及岸坡微变形机理研究现状

    MECHANISM OF MICRO DEFORMATION OF RESERVOIR BASIN AND BANK SLOPE INDUCED BY HIGH DAM IMPOUNDMENT IN CANYON AREA

    • 摘要: 峡谷高坝蓄水诱发的库盆及岸坡微变形,多指由于高坝蓄水导致两岸山体应力状态调整而产生的非失稳变形,一般数厘米到数十厘米,有的研究亦称谷幅变形(水平向)、库盆变形(竖向)、河谷变形(库区内)等。目前仅在我国少数特高坝工程中开展过监测分析,如锦屏一级、小湾、溪洛渡等,其中谷幅变形是研究的重点。然而,目前关于这一变形的系统研究和定量分析较少,基于不同工程监测数据得到的变形规律有所差异,很难用单一的理论进行解释,所提出的机理尚不完备。特别地,由于可借鉴的工程经验不足,在设计中缺乏相应技术标准,高坝蓄水导致的岸坡微变形对坝体长期影响不得而知。此外,正在建设的白鹤滩(289m)、双江口(314m)等水电站,都需要面临峡谷高坝谷幅变形的问题。因此,本文综述了这一问题的研究现状,探讨了库盆及岸坡微变形可能的机理并进行了展望。

       

      Abstract: The micro deformation of reservoir basin and bank slope induced by impoundment of high dam in canyon area mostly refers to the non-unstable deformation caused by the adjustment of mountain stress, which is generally several centimeters to tens of centimeters. In other researches, it is also called valley deformation(horizontal direction), reservoir basin deformation(vertical direction), etc. At present, monitoring and analysis have only been carried out in a few super high dam projects in China, such as Jinping I, Xiaowan, Xiluodu, etc. The proposed mechanisms and quantitative analyses are incomplete and unsystematically. The deformation law obtained from different engineering monitoring data is different, so it is difficult to explain the deformation mechanism by single theory. In particular, due to the lack of engineering experience and the lack of corresponding technical standards in the design, the long-term impact of bank slope micro deformation caused by high dam impoundment on dam is unknown. Therefore, this paper summarized the relevant research, discussed the possible mechanism of micro deformation of reservoir basin and bank slope, and finally prospected the research in future.

       

    /