    杭州地铁一号线闸弄口站监测分析

    MONITORING ANALYSIS OF ZHANONGKOU STATION OF HANGZHOU METRO LINE 1

    • 摘要: 结合工程实例介绍监测技术在杭州地铁一号线闸弄口站中的应用,重点阐述该监测技术的设计、实施及效果。本工程主要实施了水平位移、支撑轴力、地下水位监测和周围地表及建筑物的沉降监测等,并对监测点的布置、监测频率及警戒值的设置都作了科学合理的规定,达到指导施工和优化设计的目的。

       

      Abstract: The paper introduces the application of monitoring technology in Zhanongkou Station of Hangzhou metro line 1,focusing on describes the designing,carrying out and effects of the monitoring technology.The monitoring of lateral displacement,axial forces of the supports,underground water level and the settlement of ground and buildings around was conducted.And the arrangement of monitoring point,monitoring frequency and the setting of alarm value were ruled reasonably in order to guide construction and optimize designation.

       

    /