尚祖光, 石振明. 2010: 杭州某地铁站基坑开挖侧向位移预测与分析. 工程地质学报, 18(S1): 105-108.
    引用本文: 尚祖光, 石振明. 2010: 杭州某地铁站基坑开挖侧向位移预测与分析. 工程地质学报, 18(S1): 105-108.
    SHANG Zuguang, SHI Zhenming. 2010: FORECAST AND ANALYSIS ON LATERAL DISPLACEMENT OF FOUNDATION PIT EXCAVATION OF A SUBWAY STATION IN HANGZHOU. JOURNAL OF ENGINEERING GEOLOGY, 18(S1): 105-108.
    Citation: SHANG Zuguang, SHI Zhenming. 2010: FORECAST AND ANALYSIS ON LATERAL DISPLACEMENT OF FOUNDATION PIT EXCAVATION OF A SUBWAY STATION IN HANGZHOU. JOURNAL OF ENGINEERING GEOLOGY, 18(S1): 105-108.

    杭州某地铁站基坑开挖侧向位移预测与分析

    FORECAST AND ANALYSIS ON LATERAL DISPLACEMENT OF FOUNDATION PIT EXCAVATION OF A SUBWAY STATION IN HANGZHOU

    • 摘要: 介绍了杭州某地铁站基坑开挖过程中的监测的侧向位移变化情况,总结了其变化规律,对施工过程提供了参考。用FLAC软件对基坑的侧向位移进行了数值模拟,然后与实际监测结果进行了对比,阐述了影响模拟结果准确性的影响因素。

       

      Abstract: The paper introduces the monitoring lateral displacement of foundation pit excavation of a subway station in Hangzhou,and summarizes its changing law,which provides references for the construction.Then a numerical simulation of the lateral displacement of the pit is conducted with FLAC.The simulation results are compared with monitoring results,and the factors which affect the accuracy of numerical simulation are discussed.

       

    /