    控制铜绿山古矿冶遗址地面加剧变形的应急对策

    EMERGENCY MEASURES TO CONTROL INTENSIVE GROUND DISPLACEMENT OF TONGLUSHAN ANCIENT MINE SITE

    • 摘要: 铜绿山古矿冶遗址2006年下半年地面开始变形,形成三号路滑坡、草坪速凝剂厂沉陷、博物馆不均匀沉降三个变形区。地面变形过程具有拉张开裂、沉降下陷和顺时扭转三大力学特点,裂缝分布遵循与所在西边坡平行、向临空面倾斜、近坡密远坡疏三项变形规律,是遗址西边坡侧向扩张、发生右旋式倾斜所致,其主要原因是遗址西侧矿坑长期露天和井下开采生产降低边坡稳定性在爆破震动和坡顶加载作用下引起。通过查找原因,采取了监测巡视、暂停采矿、打击盗采、宣传教育、削方减载等多项软硬应急对策,暂时控制了地面加剧变形的态势。

       

      Abstract: The ancient mine site of Tonglvshan was authorized by The Central People's Government of The People's Republic of China as nation-wide key cultural relics conservation unit in 1982, and was protected by building museum in 1984. Some ground displacement was observed in the second half of 2006, and formed three displacement areas: No.3 Road landslide, Lawn-Factory of quick-setting agent, and the differentia sedimentation of this museum. This displacement is characterized as typical mechanical behaviors: tensile crack, sedimentation settling, and clockwise twisting. The distribution of fissures is desribed as follows: parallel with the west slope, inclining free face, and dense near slope sparse far slope. This distribution is the result of side expand of west slope and dextrorotation inclining, which are caused by open mining of west mine site and blasting. A united surveying group is organized by many departments of the government of Huangshi City, and takes some emergency measures to control the intensive displacement such as patroling, pausing mining, punshing steal, and so on. Also, some important projects were conducted, including protection engineering of slope, safety monitoring, building repairment. And the protection regulations of Tonglvshan ancient mine site was legislated and efective. All the above measures were conducted to ensure the permanent protection of the world culture heritage.

       

    /