姜规模, 吴群昌, 蔡金选, 张思玉, 韦显呈. 2008: 西安市某工程钢筋混凝土钻孔灌注桩试桩试验研究. 工程地质学报, 16(S1): 329-333.
    引用本文: 姜规模, 吴群昌, 蔡金选, 张思玉, 韦显呈. 2008: 西安市某工程钢筋混凝土钻孔灌注桩试桩试验研究. 工程地质学报, 16(S1): 329-333.
    JIANG Guimo, WU Qunchang, CAI Jinxuan, ZHANG Siyu, WEI Xiancheng. 2008: A RESEARCH ABOUT REINFORCED CONCRETE DRILL-HOLE PILE TESTING IN XI'AN CITY. JOURNAL OF ENGINEERING GEOLOGY, 16(S1): 329-333.
    Citation: JIANG Guimo, WU Qunchang, CAI Jinxuan, ZHANG Siyu, WEI Xiancheng. 2008: A RESEARCH ABOUT REINFORCED CONCRETE DRILL-HOLE PILE TESTING IN XI'AN CITY. JOURNAL OF ENGINEERING GEOLOGY, 16(S1): 329-333.

    西安市某工程钢筋混凝土钻孔灌注桩试桩试验研究

    A RESEARCH ABOUT REINFORCED CONCRETE DRILL-HOLE PILE TESTING IN XI'AN CITY

    • 摘要: 以西安市某建设工程钢筋混凝土钻孔灌注桩试桩试验丰富的观测资料为依据,对试桩试验测试的桩孔质量和桩身完整性进行了分析和评价;通过计算和分析研究确定了试桩单桩竖向抗压极限承载力、桩周土极限侧阻力和桩端阻力等参数。该研究试验确定的各层桩周土极限侧摩阻力和单桩极限承载力比《建筑桩基技术规范》(JGJ94-94)和该工程岩土勘察报告提供的建议值分别高约10%~60%和50%;而本次试验条件下测试的桩顶荷载主要由桩侧阻力承担,而桩端阻力未充分发挥,只发挥了约20%~60%。通过对试桩试验测试结果的分析研究,建议该办公楼钢筋混凝土钻孔灌注桩桩长可比设计桩长减少5m,节约大量资金,又节省工期,将取得良好的效益。

       

      Abstract: This article for basis with a construction engineering abundant of prognosticate data reinforced concrete drill-hole pile static loading test in Xi'an City, neither to analyse and evaluate the bored pile quality and the pile integrity; nor certaine those parameter such as the ultimate bearing capacity,the around pile shaft ultimate resistance and the the end bearing capacity of pile etc. This pile testing result has been certained the around pile shaft ultimate resistance each layer soil and the ultimate bearing capacity layer that 《Technical code for building pile foundation 》 (JGJ94-94) investigate the suggestions about 10%~60% and 50% with the yeotechnical engineering reconnaissance report investigate the suggestions。But this reinforced concrete drill-hole pile testing under the conditions carry mainly from the around pile shaft ultimate resistance, the end bearing capacity of pile don't develop all, only developped about 20% ~60%. Throuth this testing result of analytical research, This building the long of the reinforced concrete drill-hole pile not only can reduce 5 meters from Original design, but also economize a great deal of funds, save work a period again, obtain well performance.

       

    /