晏长根, 石玉玲, 杨晓华. 2002: 滑坡数值分析的接触问题. 工程地质学报, 10(S1): 369-372.
    引用本文: 晏长根, 石玉玲, 杨晓华. 2002: 滑坡数值分析的接触问题. 工程地质学报, 10(S1): 369-372.
    YAN Changgen, SHI Yuling, YANG Xiaohua. 2002: THE CONTACT PROBLEMS OF LANDSLIDE'S NUMERCIAL ANALYSIS. JOURNAL OF ENGINEERING GEOLOGY, 10(S1): 369-372.
    Citation: YAN Changgen, SHI Yuling, YANG Xiaohua. 2002: THE CONTACT PROBLEMS OF LANDSLIDE'S NUMERCIAL ANALYSIS. JOURNAL OF ENGINEERING GEOLOGY, 10(S1): 369-372.

    滑坡数值分析的接触问题

    THE CONTACT PROBLEMS OF LANDSLIDE'S NUMERCIAL ANALYSIS

    • 摘要: 对滑坡数值分析中的接触问题进行了全面论述,并重点介绍了直接约束法,最后利用MARC程序进行了有无接触的实例分析比较。

       

      Abstract: This paper discusses different contact problems in numerical analysis of landslides,especially intro-duces the methold of directly applied displacement boundary conditions, and using MARC to analysis a example with contact condictions or without contact condictions.

       

    /

    返回文章
    返回