郭书太. 2004: 大型河流采用定向钻机进行管道穿越的工程地质问题. 工程地质学报, 12(S1): 273-276.
    引用本文: 郭书太. 2004: 大型河流采用定向钻机进行管道穿越的工程地质问题. 工程地质学报, 12(S1): 273-276.
    GUO Shutai. 2004: ENGINEERING GEOLOGIC PROBLEMS IN PIPELINE PASSING THROUGH LARGE RIVER WITH DIRECTIONAL DRILLING MACHINE. JOURNAL OF ENGINEERING GEOLOGY, 12(S1): 273-276.
    Citation: GUO Shutai. 2004: ENGINEERING GEOLOGIC PROBLEMS IN PIPELINE PASSING THROUGH LARGE RIVER WITH DIRECTIONAL DRILLING MACHINE. JOURNAL OF ENGINEERING GEOLOGY, 12(S1): 273-276.

    大型河流采用定向钻机进行管道穿越的工程地质问题

    ENGINEERING GEOLOGIC PROBLEMS IN PIPELINE PASSING THROUGH LARGE RIVER WITH DIRECTIONAL DRILLING MACHINE

    • 摘要: 我国自80年代引进定向钻技术以来,已在长输管道行业成功穿越大中型河流数十条。工程地质条件在穿越设计和制定施工方案时具有决定性作用,系统地进行工程地质勘察是非常必要的。针对这类特殊工程,提出了勘察工作的具体内容和方法。

       

      Abstract: Since the directional drilling technology was introduced into our country in 1980s, tens of large and medium rivers had been passed though successfully. Because engineering geologic conditions act a decisive role when making traverse design and execution project, it is necessary to make systemic engineering geologic investigation. Considering this special engineering, concrete contents and methods are proposed in the paper.

       

    /

    返回文章
    返回