李志荣. 2004: 青藏铁路高原高寒多年冻土区桥梁施工技术. 工程地质学报, 12(S1): 361-367.
    引用本文: 李志荣. 2004: 青藏铁路高原高寒多年冻土区桥梁施工技术. 工程地质学报, 12(S1): 361-367.
    LI Zhirong. 2004: BRIDGE CONSTRUCTION TECHNIQUES IN PLATEAU AND HIGH-COLD PERMAFROST OF QING-TIBET RAILWAY. JOURNAL OF ENGINEERING GEOLOGY, 12(S1): 361-367.
    Citation: LI Zhirong. 2004: BRIDGE CONSTRUCTION TECHNIQUES IN PLATEAU AND HIGH-COLD PERMAFROST OF QING-TIBET RAILWAY. JOURNAL OF ENGINEERING GEOLOGY, 12(S1): 361-367.

    青藏铁路高原高寒多年冻土区桥梁施工技术

    BRIDGE CONSTRUCTION TECHNIQUES IN PLATEAU AND HIGH-COLD PERMAFROST OF QING-TIBET RAILWAY

    • 摘要: 针对青藏铁路高原高寒多年冻土区桥梁工程的施工特点,较详细地探讨了高原高寒多年冻土区桥梁工程施工的技术措施和施工工艺。

       

      Abstract: To the construction characteristics of bridge engineering in Plateau and High-cold Permafrost of Qing-Zang Railway, this paper discussed the technical measures and construction techniques of bridge engineering in detail.

       

    /