李志荣. 2004: 高原高寒多年冻土区半填半挖路基施工技术. 工程地质学报, 12(S1): 372-376.
    引用本文: 李志荣. 2004: 高原高寒多年冻土区半填半挖路基施工技术. 工程地质学报, 12(S1): 372-376.
    LI Zhirong. 2004: CONSTRUCTION TECHNIQUES OF SEMI-FILLING AND SEMI-EXCAVATING SUBGRADES IN PLATEAU AND HIGH-COLD PERMAFROST AREAS. JOURNAL OF ENGINEERING GEOLOGY, 12(S1): 372-376.
    Citation: LI Zhirong. 2004: CONSTRUCTION TECHNIQUES OF SEMI-FILLING AND SEMI-EXCAVATING SUBGRADES IN PLATEAU AND HIGH-COLD PERMAFROST AREAS. JOURNAL OF ENGINEERING GEOLOGY, 12(S1): 372-376.

    高原高寒多年冻土区半填半挖路基施工技术

    CONSTRUCTION TECHNIQUES OF SEMI-FILLING AND SEMI-EXCAVATING SUBGRADES IN PLATEAU AND HIGH-COLD PERMAFROST AREAS

    • 摘要: 主要介绍了青藏铁路半填半挖路基地段施工方法及施工工艺。

       

      Abstract: The construction methods and techniques of semi-filling and semi-excavating subgrades in Qing-Zang railway are mainly introduced in this paper.

       

    /

    返回文章
    返回