杨秀梅, 梁收运. 2007: 模糊方法在地质灾害危险性评价中的应用. 工程地质学报, 15(S1): 650-654.
    引用本文: 杨秀梅, 梁收运. 2007: 模糊方法在地质灾害危险性评价中的应用. 工程地质学报, 15(S1): 650-654.
    YANG Xiumei, LIANG Shouyun. 2007: APPLICATION OF FUZZY TECHNIQUE ON DANGER LEVEL ASSESSMENT OF GEOLOGICAL HAZARD. JOURNAL OF ENGINEERING GEOLOGY, 15(S1): 650-654.
    Citation: YANG Xiumei, LIANG Shouyun. 2007: APPLICATION OF FUZZY TECHNIQUE ON DANGER LEVEL ASSESSMENT OF GEOLOGICAL HAZARD. JOURNAL OF ENGINEERING GEOLOGY, 15(S1): 650-654.

    模糊方法在地质灾害危险性评价中的应用

    APPLICATION OF FUZZY TECHNIQUE ON DANGER LEVEL ASSESSMENT OF GEOLOGICAL HAZARD

    • 摘要: 地质灾害评估是协调人地关系研究的重要内容,可为大型工程建设的前期工作提供基本依据。本文采用模糊综合评价法,选择历史灾害危险性、潜在灾害危险性2个基本要素和相应的8个评价因子,对甘肃省洮河莲麓水电站建设用地地质灾害危险性进行了评估。结果表明:河谷地貌区和山间盆地地貌区地质灾害危险性中等,中山地貌区地质灾害危险性小。

       

      Abstract: Geological hazard assessment is important content to study harmony of human being and earth, which can afford the basic gist for prophase work of the large-scale engineering build. Two basic factors such as harmfulness of historical, harmfulness of latent disaster and eight relevant estimate factors is selected.Fuzzy synthetical evaluation method is adopted to evaluate the danger level geological hazard in the hydropower station construction of LianLu,GanSu Province. Result indicate:geological hazard level in river and the mountai basin arear is middle, geological hazard level is weak in medium mountain arear.

       

    /

    返回文章
    返回