何剑, 赵海生, 谷秀萍, 龚书浩. 2002: 后注浆硷灌注的检测技术. 工程地质学报, 10(S1): 633-636,671.
    引用本文: 何剑, 赵海生, 谷秀萍, 龚书浩. 2002: 后注浆硷灌注的检测技术. 工程地质学报, 10(S1): 633-636,671.
    He Jian, Zhao Haisheng, Gu Xiuping, Gong Shuhao. 2002: INSPECTION TECHNIQUE OF CONCRETE FILLING PILE AFTER GROUT INJECTION. JOURNAL OF ENGINEERING GEOLOGY, 10(S1): 633-636,671.
    Citation: He Jian, Zhao Haisheng, Gu Xiuping, Gong Shuhao. 2002: INSPECTION TECHNIQUE OF CONCRETE FILLING PILE AFTER GROUT INJECTION. JOURNAL OF ENGINEERING GEOLOGY, 10(S1): 633-636,671.

    后注浆硷灌注的检测技术

    INSPECTION TECHNIQUE OF CONCRETE FILLING PILE AFTER GROUT INJECTION

    • 摘要: 通过工程实例,介绍了后注浆技术及其在提高硷钻孔灌注桩承载力方面的效果检测,并提出了通过注浆管采用声波透射法对桩身进行检测的理论与实践,同时总结了后注浆硷灌注桩检测中应注意的问题。

       

      Abstract: Through engineering case, after grout injection technique and its result check for improvement on bearing capacity of concrete bored pile are introduced. The theory and practice of inspection on the pile adopting sonic transmissing-beam method through grout pipe are also advanced. The problems worth attention. of inspection on concrete filling pile after grout injection.

       

    /

    返回文章
    返回