漆富冬. 1996: 柘溪水库拦门沙淤积问题及治理对策探讨. 工程地质学报, 4(2): 14-18.
    引用本文: 漆富冬. 1996: 柘溪水库拦门沙淤积问题及治理对策探讨. 工程地质学报, 4(2): 14-18.
    Qi Fudong. 1996: A DISCUSSION ON THE BAR SEDIMENTATION IN ZHEXI RESERVOIR AND ITS CONTROLLING MEASURES. JOURNAL OF ENGINEERING GEOLOGY, 4(2): 14-18.
    Citation: Qi Fudong. 1996: A DISCUSSION ON THE BAR SEDIMENTATION IN ZHEXI RESERVOIR AND ITS CONTROLLING MEASURES. JOURNAL OF ENGINEERING GEOLOGY, 4(2): 14-18.

    柘溪水库拦门沙淤积问题及治理对策探讨

    A DISCUSSION ON THE BAR SEDIMENTATION IN ZHEXI RESERVOIR AND ITS CONTROLLING MEASURES

    • 摘要: 柘溪水库于1961年2月15日下闸蓄水, 至1995年3月, 已运行34年。由于拦门沙淤积, 抬高了上游的洪水位, 增大了库周及库尾的淹设损失, 影响了航运, 必须及时进行整治。本文根据对水库拦门沙地质调查测量资料, 分析泥沙来源, 探讨治理对策。

       

      Abstract: The Zhexi Reservoir was impounded from Feb. 15 1961 by closinggate. Up to March of 1995 it was operating 34 years. Because of bar sedimentation the water level rises in the upstream in flood season and hence the losses from inundation in its surroundings and tail of thereservoir increase and the transport is influenced. Thus it must betreated in time. From geological investigation and observation data of the bar sedimentation, an analysis of the source for silt is made audits controlling measures are discussed in the paper.

       

    /

    返回文章
    返回