刘光华, 张玲, 陈隆刚, 熊超, 蒋莉. 2014: 压矿采动对线性水利工程影响研究. 工程地质学报, 22(s1): 249-257. DOI: 10.13544/j.cnki.jeg.2014.s1.042
    引用本文: 刘光华, 张玲, 陈隆刚, 熊超, 蒋莉. 2014: 压矿采动对线性水利工程影响研究. 工程地质学报, 22(s1): 249-257. DOI: 10.13544/j.cnki.jeg.2014.s1.042
    Liu Guanghua, Zhang Ling, Chen Longgang, Xiong Chao, Jiang Li. 2014: THE MINING INFLUENCE RESEARCH OF PRESSURE MINERAL IN LINEAR WATER CONSERVANCY PROJECT. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 249-257. DOI: 10.13544/j.cnki.jeg.2014.s1.042
    Citation: Liu Guanghua, Zhang Ling, Chen Longgang, Xiong Chao, Jiang Li. 2014: THE MINING INFLUENCE RESEARCH OF PRESSURE MINERAL IN LINEAR WATER CONSERVANCY PROJECT. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 249-257. DOI: 10.13544/j.cnki.jeg.2014.s1.042

    压矿采动对线性水利工程影响研究

    THE MINING INFLUENCE RESEARCH OF PRESSURE MINERAL IN LINEAR WATER CONSERVANCY PROJECT

    • 摘要: 随着易采煤矿资源的逐渐减少和基础水利工程建设的势在必行,压矿开采不可避免。在压覆煤矿资源合理开采的情况下,如何保证基础水利工程设施的正常运行是一个重大的现实难题。本文以重庆金佛山水利工程输水渠系为例,运用沉陷预计MSPS系统预计压矿采动引起的地表沉陷各项数据,分析压矿采动对线性水利工程输水渠系产生的影响,提出相应的变形处置措施。研究结果表明,线性水利工程压矿采动对水利工程的影响是显著的,影响系指采动沉陷引起地表线性水利工程产生变形,导致输水渠系结构破坏引起水体疏漏,差异沉降导致水体漫溢,导水裂隙和冒落带的影响通常较小,通过减小沉降缝设置间距以及增加渠系高度方法可消除地表沉陷对线性水利工程的危害。

       

      Abstract: With the mining of coal resources reducing gradually and the imperative of water conservancy project construction, pressed coal mining is inevitable. In the rational exploitation of pressure coal resources condition, how to ensure the safe operation of water conservancy facilities is an important realistic problem.This paper takes Chongqing Jinfo Mountain canal of conservancy engineering as an example, using subsidence MSPS system to analyze the surface subsidence data under pressure mineral mining. This paper researches its impact on the canal of linear water conservancy project according to the result, and puts forward the deformation treatment and control measures finally. Through the research on the results of Chongqing Jinfo Mountain canal conservancy engineering department, linear water conservancy project pressure mining on the influence of water conservancy project is significant, the effect refers to deformity caused by presssure mining, while the water flowing fractured and caving zone have little impact on linear water coservancy project. It can eliminate the surface subsidence hazard by reducing the settlement joint spacing and increasing the canal height.

       

    /

    返回文章
    返回