    某焦化工程钻孔灌注桩试桩结果分析

    EXPERIMENT DATA ANALYSIS OF BOILED PILE OF A CERTAIN COKING PROJECT

    • 摘要: 山西某焦炉工程试桩结果未达到设计要求,经分析认为是由于正循环钻进的成孔工艺与场地条件不相适宜。在本工程场地采用该成孔工艺,泥皮及沉渣较厚,为克服该缺陷,后改用旋挖成孔。经再次试桩,结果满足要求。试桩结果分析表明应根据场地条件选择合适的施工工艺,以最大限度地挖掘地基潜力,使侧摩及端阻充分发挥,以获取最大的单桩承载力。

       

      Abstract: Test pile experiment for a certain project in Shanxi suggests qualities of piles do not meet standard requirement, as the inverse drilling technique is not suitable under this circumstance. Nonetheless, when rotating drilling is preferred due to thick layer of mud cakes and sediments involved in this project, standard requirement can be satisfied. This research indicates that selection of appropriate drilling technique is strictly based on work field conditions. By doing so the drilling capacity can be further increased due to the enlarged side and tip frictions. Bearing capacity of single pile can therefore be achieved.

       

    /