MA Fengshan, LI Kepeng, LIU Feng, LU Rong, YUE Bin, LEI Yang. 2015: FACTORS OF FILL MASS STABILITY IN THE JINCHUAN NO.2 MINE. JOURNAL OF ENGINEERING GEOLOGY, 23(s1): 504-508. DOI: 10.13544/j.cnki.jeg.2015.s1.077
    Citation: MA Fengshan, LI Kepeng, LIU Feng, LU Rong, YUE Bin, LEI Yang. 2015: FACTORS OF FILL MASS STABILITY IN THE JINCHUAN NO.2 MINE. JOURNAL OF ENGINEERING GEOLOGY, 23(s1): 504-508. DOI: 10.13544/j.cnki.jeg.2015.s1.077

    FACTORS OF FILL MASS STABILITY IN THE JINCHUAN NO.2 MINE

    • With high selectivity and low dilution, Cut- and -fill stoping plays an irreplaceable role in deposit mining projects, especially in which occurrence conditions of orebody are complicated, surface environmental protection needed and rockburst easily triggered. Cut- and -fill mining practices of past decades demonstrated that the main factors affecting fill mass stability include engineering geological condition, back-fill strength, stoping technology and surrounding-rock boundary condition and so on. The back-fill strength is the key factor for success or failure of the backfilling project. And the dimension of orebody-stoping drift is the critical factor affecting fill mass supporting layer stability. The irregular boundaries between fill mass and surrounding rock can transfer part of the former self-gravity into the latter, reduce the load on the supporting layers, and then advance the stability of the fill mass.
    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return