THE METHOD OF RECONNAISSANCE AND APPLICATION OF PRODUCTION FOR TUNNEL PROJECT IN ROCK-DISSOLVE DISTRICT EXAMPLE: NANYANG TUNNEL IN JIURUI FREEWAY
-
Graphical Abstract
-
Abstract
Reconnaissance of Nanyang tunnel shows it is an important approach of optimizing tunnel-design scheme to adopt multi-method reconnaissance and apply integrative reconnaissance production to explain and find out the geological condition of project in the district under the complex condition in rock-dissolve district.
-
-