DENG Weidong, FENG Jianming, YU Zhiping. 2008: THINKING ABOUT THE EXPLOITATION AND CONSTRUCTION OF SLOPES IN MEDIUM AND SMALL-SIZED HYDROPOWER PROJECTS. JOURNAL OF ENGINEERING GEOLOGY, 16(S1): 267-269.
    Citation: DENG Weidong, FENG Jianming, YU Zhiping. 2008: THINKING ABOUT THE EXPLOITATION AND CONSTRUCTION OF SLOPES IN MEDIUM AND SMALL-SIZED HYDROPOWER PROJECTS. JOURNAL OF ENGINEERING GEOLOGY, 16(S1): 267-269.

    THINKING ABOUT THE EXPLOITATION AND CONSTRUCTION OF SLOPES IN MEDIUM AND SMALL-SIZED HYDROPOWER PROJECTS

    • In the recent years, hydropower construction is speeding up, the time of the survey and testing is very pressing, and the working cycle of the survey and design shorten at preparation stage, it causes that survey work is insufficient and the engineering geological condition of part buildings can not be found out in detail. Meanwhile, because of catch the time limit in the process of construction, the parts that need take engineering treatment measures don't be timely treated, result in the engineering geological condition worsening and emergency project. Accordingly construction period is delayed and project investment is increased. Combining with engineering example, the paper offers basic recognition and thinking.
    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return