    APPLICATION OF PRE-STRESSED CABLE PREVENT AND CONTROL THE HIGH SLOPE GEOLOGICAL DISASTER

    • Based on surveying and analyzing the section of soil-rock high slope, used pre-stressed cable to prevent land-slide. This method solved the technical problems of forming the hole in the soil-rock and lattice beam construction. In this paper also introduction the pre-stressed cable field testing methods and tested results. The results meet the design requirements and the relevant norms.