Chen Zhixin. 2002: PROBLEM ANALYSIS ON THE GEOTEOCHNIQUE IN THE WAY OF PIPELINE WITHIN THE ZHONG WEI COUNTY IN TIE PROJECT OF"GAS TRANSPORTATION FROM WEST TO EAST". JOURNAL OF ENGINEERING GEOLOGY, 10(S1): 586-591.
    Citation: Chen Zhixin. 2002: PROBLEM ANALYSIS ON THE GEOTEOCHNIQUE IN THE WAY OF PIPELINE WITHIN THE ZHONG WEI COUNTY IN TIE PROJECT OF"GAS TRANSPORTATION FROM WEST TO EAST". JOURNAL OF ENGINEERING GEOLOGY, 10(S1): 586-591.

    PROBLEM ANALYSIS ON THE GEOTEOCHNIQUE IN THE WAY OF PIPELINE WITHIN THE ZHONG WEI COUNTY IN TIE PROJECT OF"GAS TRANSPORTATION FROM WEST TO EAST"

    • The project of "Gas Transportation From west to East" is a main important project in china, The way that pipeline goes within the Zhong wei county is the south of Teng Ge desert, Weining irrigable area and some of mountain-ous area,where have complex geology condition and weak ecological setting. Based on the information got from geotechnical survey, this paper puts forward a close analysis, and values it by some related specifications.
    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return