Guo Yingzhong. 1997: PRELIMINARY STUDY OF THE GEOSTRESS FILED IN THE DIVERSION ENGINEERING SITE OF JINPING Ⅱ HYDROELECTRIC PROJECT. JOURNAL OF ENGINEERING GEOLOGY, 5(1): 41-46.
    Citation: Guo Yingzhong. 1997: PRELIMINARY STUDY OF THE GEOSTRESS FILED IN THE DIVERSION ENGINEERING SITE OF JINPING Ⅱ HYDROELECTRIC PROJECT. JOURNAL OF ENGINEERING GEOLOGY, 5(1): 41-46.

    PRELIMINARY STUDY OF THE GEOSTRESS FILED IN THE DIVERSION ENGINEERING SITE OF JINPING Ⅱ HYDROELECTRIC PROJECT

    • Based on a geomechanical analysis of the regional tectonic stress filed in combination with a in laboratory measuring of the geostress occuring at the oriented marble samples drilled out at the trial adit of the diversion tunnel proposed, this paper has made a preliminary study of geostress filed in the site, compared a relation of geomechanical macro analysis to geostress measuring results, and approached some problems with respect to geostress measuring by acoustic emission (AE) mdthod。
    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return