column
    KINETICS CHARATERISTICS OF LARGE LANDLIDES TRIGGERED BY MAY 12TH WENCHUAN EARTHQUAKE
    ,
    2008, 16(6): 721-729.
    Abstract PDF
    BASIC CHARACTERISTICS AND FORMATION MECHANISM OF |THE LARGEST SCALE LANDSLIDE AT DAGUNGBAO OCCURRED DURING THE WENCHUAN EARTHQUAKE
    HUANG Runqiu, PEI Xiangjun, LI Tianbin
    2008, 16(6): 730-741.
    Abstract PDF
    FAILURE CHARACTERISTICS AND INFLUENCE FACTOR ANALYSIS OF MOUNTAIN TUNNELS AT EPICENTER ZONES OF GREAT WENCHUAN EARTHQUAKE
    LI Tianbin
    2008, 16(6): 742-750.
    Abstract PDF
    CHARACTERISTICS OF DEBRIS FLOWS IN BEICHUAN EPICENTER OF THE WENCHUAN EARTHQUAKE TRIGGERED BY RAINSTORM ON SEPTEMBER 24, 2008
    TANG Chuan, , LIANG Jingtao
    2008, 16(6): 751-758.
    Abstract PDF
    ANALYSIS OF THE CONTROLLING FACTORS |ON |GEO-HAZARDS IN MOUNTAINOUS EPICENTER ZONES OF |THE WENCHUAN EARTHQUAKE
    WANG Yunsheng, LUO Yonghong, JI Feng, HUO Junjie, WU Junfeng, XU Hongbiao
    2008, 16(6): 759-763.
    Abstract PDF
    ENGINEERING GEOLOGICAL ASSESSMENTS OF RECONSTRUCTION SITES FOR CITIES AND TOWNS DESTROYED |BY WENCHUAN EARTHQUAKE
    LI Yusheng, HUANG Runqiu
    2008, 16(6): 764-773.
    Abstract PDF
    APPLICATION OF 3D LASER SCANNER IN MAKING DUWEN ROAD TRAVELABLE IN SHORT TERM AFTER WENCHUAN EARTHQUAKE
    DONG Xiujun, HUANG Runqiu
    2008, 16(6): 774-780.
    Abstract PDF
    CURRENT STATUS |OF CLAYEY SEEPAGE CONTROL SYSTEM |FOR |MUNICIPAL SOLID WASTE LANDFILL
    CHEN Yonggui, YE Weimin, ZHANG Keneng
    2008, 16(6): 780-787.
    Abstract PDF
    ANALYSIS AND FORECAST OF LARGE ROCK BLOCK INSTABILITY AT TOP ARCH UNDER COMPLEX GEOLOGICAL CONDITION
    REN Aiwu, WU Faquan, FAN Yongbo, XIONG Zheng, HU Xiuhong
    2008, 16(6): 788-792.
    Abstract PDF
    STABILITY ANALYSIS OF THE SLOPE INSIDE APPROACH CHANNEL AT JINGPING HYDROELECTRIC POWER STATION
    WANG Dong, WU Faquan, REN Aiwu
    2008, 16(6): 793-797.
    Abstract PDF
    ANALYSIS OF CHEMICAL INTERACTION BETWEEN WATER AND SANDSTONE AT LONGYOU GROTTOES
    LI Li, WANG Sijing, Chikaosa TANIMOTO, ZHENG Jian
    2008, 16(6): 798-805.
    Abstract PDF
    A CASE STUDY ON THE CAUSE AND TREATMENT OF HUGE COLLAPSE OF HIGHWAY TUNNEL DURING CONSTRUCTION
    LI Zhihou, YANG Xiaohua, LAI Fengpeng, YAN Changgen
    2008, 16(6): 806-812.
    Abstract PDF
    FLEXIBLE OR RIGID LOADING TESTS FOR BEARING CAPACITY OF CFG PILE COMPOSITE FOUDATION ALONG HIGH-SPEED RAILWAY
    LIU Shengchuan, WANG Lianjun, DING Guiling
    2008, 16(6): 813-819.
    Abstract PDF
    EXPERIMENTAL STUDY ON SWELLING AND SHRINKING PROPERTY OF CLAY |TREATED WITH STW POLYMER SOIL STABILIZER
    LIU Jin, SHI Bin, HUANG He, JIANG Hongtao
    2008, 16(6): 820-825.
    Abstract PDF
    BOTDR BASED DISTRIBUTED STRAIN TEST ON BORED PILE BURIED IN COMPLICATED GEOLOGICAL GROUND
    WEI Guangqing, SHI Bin, YU Xiaokui, PIAO Chunde, ZHU Youqun, WANG Baojun
    2008, 16(6): 826-832.
    Abstract PDF
    IN-SITU STRESS MEASUREMENT WITH KAISER EFFECT OF ROCK ACOUSTIC EMISSION
    , , ,
    2008, 16(6): 833-838.
    Abstract PDF
    APPLICATION OF SEISMIC CT AND FBG SENSOR TECHNIQUES |TO TUNNEL STRUCTURE DIAGNOSIS
    LI Dan, LI Chuan, ZHAO Yonggui, LIU Chang
    2008, 16(6): 839-843.
    Abstract PDF
    STATISTICAL ANALYSIS OF THE RESEARCH PROPOSALS |IN ENGINEERING GEOLOGY FOR NSFC GRANTS BETWEEN 2003 AND 2007
    XIONG Juhua, LIU Yu, YAO Yupeng
    2008, 16(6): 844-852.
    Abstract PDF