Lin Jinhong. 2014: THE MAIN ENGINEERING GEOLOGICAL PROBLEMS AND PROCESSING OF MIANHUATAN HYDROPOWER STATION DAM FOUNDATION. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 258-263. DOI: 10.13544/j.cnki.jeg.2014.s1.043
    Citation: Lin Jinhong. 2014: THE MAIN ENGINEERING GEOLOGICAL PROBLEMS AND PROCESSING OF MIANHUATAN HYDROPOWER STATION DAM FOUNDATION. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 258-263. DOI: 10.13544/j.cnki.jeg.2014.s1.043

    THE MAIN ENGINEERING GEOLOGICAL PROBLEMS AND PROCESSING OF MIANHUATAN HYDROPOWER STATION DAM FOUNDATION

    • The dam location of Mianhuatan hydropower station shows symmetrical cross-strait terrain, with high and steep mountain and narrow river, where there has RCC gravity dam whose height is more than hundred's meters. Underground houses are in the left bank. Dam foundation's main engineering geological problems are: dam foundation stability against sliding, leakage of dam foundation and high slope on both sides, etc. This article mainly introduces engineering treatnent measures for engineering geological problems, which would be a reference for similar project.
    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return