THE TEST AND ASSESSMENT OF CONSOLIDATION GROUTING IN RIVER BED DAM FOUNDATION OF XILUODU HYDROPOWER STATION
-
Abstract
Xiluodu hydropower station is located on the Jinshajiang River, with a 285.5m high arch dam. The bedrock of the dam foundation consists of basalt, which can be dominantly classified as Ⅲ-1 class with some local distribution of disturbed Ⅲ-2 class. The average acoustic velocity of the bedrock is originally 4652ms-1, with about 28% being slower than 4000ms-1.After consolidation grouting treatment, the average velocity is greater than 5200ms-1, with less than 5% being slower than 4000ms-1.After treatment, the average velocity of the Ⅲ-1 class bedrock has reached 5300~5500ms-1, being increased by 2%~5%; the Ⅲ-2 class 4200~4700ms-1, being increased by 12%~18%; the disturbed belt 3600~4200ms-1, being increased by 10%~28%, respectively. The rock permeability are less than 3 Lu and the average borehole deformation modulus is 10-15GPa. Consolidation grouting has dramatically improved the geological condition of the Ⅲ-2 class rock mass and the disturbed belt, which has effectively improved the integrity and homogeneity of the riverbed dam foundation.
-
-