CHEN Guangping, ZHAO Qihua, HUANG Heqing. 2011: SLIDING CHARACTERISTICS OF HIGH-SPEED AND LONG RUN-OUT GIANT ROCKSLIDE LANDSLIDE AT WENJIAGOU STREAM. JOURNAL OF ENGINEERING GEOLOGY, 19(3): 404-408.
Citation: CHEN Guangping, ZHAO Qihua, HUANG Heqing. 2011: SLIDING CHARACTERISTICS OF HIGH-SPEED AND LONG RUN-OUT GIANT ROCKSLIDE LANDSLIDE AT WENJIAGOU STREAM. JOURNAL OF ENGINEERING GEOLOGY, 19(3): 404-408.

SLIDING CHARACTERISTICS OF HIGH-SPEED AND LONG RUN-OUT GIANT ROCKSLIDE LANDSLIDE AT WENJIAGOU STREAM

Funds:

  • Received Date: 2011-02-10
  • Rev Recd Date: 2011-05-20
  • Publish Date: 2011-06-25
  • Wenjiagou landslide is a giant rockslide with high-speed and long run-out.It was triggered by the 2008 Wenchuan earthquake.But its sliding characteristic is unclear so far.This paper presents a study on the sliding characteristic of this rockslide.It is based on the field investigation and is combined with remote sensing interpretation.The conclusions are as follows: The slip mass started diversity from source area,scraped rock-soil body of slope surface at the slope area,and then glided or flied into Wenjia gully,continued to downslide along the gully,meanwhile scraped the both valley side slopes.The rock mass occurred five times large-scale collisions with the bank slopes,disintegrated into debris gradually.The debris began to slow down and accumulate in large-scale after the third collision.Finally some sediments reached the valley mouth.The results show that,the hilly terrain is the controlling factor of sliding and accumulation of slip mass,climb,toss,overtopping of slip mass when it crashed into a hill.The disintegration into debris of slip mass and the formation of air blast were the concrete manifestation of high-speed travel.The collision was the main way leading to the disintegration of debris in the whole process.
  • loading
  • [1] 黄润秋, 等.汶川地震地质灾害研究
    [M].北京: 科学出版社, 2009.
    Huang Runqiu,et al. Geohazard assessment of the Wenchuan earthquake.Beijing: Science Press, 2009.


    [2] 胡广韬, 戴鸿麟.滑坡动力学
    [M].北京: 地质出版社, 1995.
    Hu Guangtao,Dai Hongling. Landslide Dynamics.Beijing: Geology Press, 1995.


    [3] 王思敬, 王效宁.大型高速滑坡的能量分析及其灾害预测 .全国滑坡学术讨论会滑坡论文选集 .成都: 四川科学技术出版社, 1989, 117~124.
    Wang Sijing,Wang Xiaoning. Analysis of energy on large-scale high speed landslide and their catastrophic prediction.In: Selected Papers on Landslide .Chengdu: Sichuan Science and Technology Press, 1989, 117~124.


    [4] 刘涌江, 胡厚田,赵晓彦.高速滑坡岩体碰撞效应的试验研究
    [J].岩土力学, 2004, 25 (2): 255~260.
    Liu Yongjiang,Hu Houtian,Zhao Xiaoyan. Experimental study on impact effect of high-speed landslide.Rock and Soil Mechanics, 2004, 25,(2): 255~260.


    [5] 程谦恭, 张倬元,黄润秋.高速远程崩滑动力学的研究现状及发展趋势
    [J].山地学报, 2007, 25 (1): 72~84.
    Cheng Qiangong,Zhang Zhuoyuan,Huang Runqiu.Study on dynamics of rock avalanches: State of the artreport.Journal of Mountain Science, 2007, 25 (1): 72~84.


    [6] 黄润秋, 裴向军,李天斌.汶川地震触发大光包巨型滑坡基本特征及形成机理分析
    [J].工程地质学报, 2008, 16 (6): 730~741.
    Huang Runqiu,Pei Xiangjun,Li Tianbin. Basic characteristics and formation mechanism of the largest scale landslide at Daguangbao occurred during the Wenchuan earthquake.Journal of Engineering Geology, 2008, 16 (6): 730~741.


    [7] 殷跃平. 汶川八级地震滑坡高速远程特征分析
    [J].工程地质学报, 2009, 17 (2): 153~164.
    Yin Yueping. Rapid and long run-out features of landslides triggered by the Wenchuan earthquake.Journal of Engineering Geology, 2009, 17 (2): 153~164.


    [8] 孙萍,张永双,殷跃平,等.东河口滑坡-碎屑流高速远程运移机制探讨
    [J].工程地质学报,2009, 17 (6):737~744.
    Sun Ping, Zhang Yongshuang, Yin Yueping, et al. Discussion on Long Run-out Sliding Mechanism of Donghekou Landslide-debris Flow
    [J]. Journal of Engineering Geology, 2009, 17 (6):737~744.


    [9] 黄河清, 赵其华.汶川地震诱发文家沟巨型滑坡-碎屑流基本特征及成因机制初步分析
    [J].工程地质学报, 2010, 18 (2): 168~177.
    Huang Heqing,Zhao Qihua.Basic characteristics and preliminary mechanism analysis of large scale rockslide-sturzstrom at Wenjiagou triggered by Wenchuan earthquake.Journal of Engineering Geology, 2010, 18 (2): 168~177.


    [10] 黄河清. 地震诱发滑坡(碎屑流)成因机理及运动学特性初步研究——以文家沟滑坡-碎屑流灾害为例 .成都理工大学硕士论文, 2010.
    Huang Heqing.Preliminary study on the mechanism and kinematics characteristics of rockslides(sturzstrom)triggereed by earthquake——Taking the Wenjiagou rockslide-sturzstrom as an example.Master thesis of Chengdu University of Technology, 2010.


    [11] 王涛, 石菊松,吴树仁,等.汶川地震触发文家沟高速远程滑坡-碎屑流成因机理分析
    [J].工程地质学报, 2010, 18 (5): 631~644.
    Wang Tao,Shi Jusong,Wu Shuren,et al.Formation mechanism of Wenjiagou high-speed and long runout debris avalanche triggered by Wenchuan earthquake.Journal of Engineering Geology, 2010, 18 (5): 631~644.


    [12] 文联勇, 等.文家沟泥石流勘查设计书 .四川省地质工程集团公司, 2008.
    Wen Lianyong,et al.Wenjiagou debis flow survey design report.Sichuan Geological Engineering Group Corporation, 2008.


    [13] 余斌, 马煜,吴雨夫.汶川地震后四川省绵竹市清平乡文家沟泥石流灾害调查研究
    [J].工程地质学报, 2010, 18 (6): 827~836.
    Yu Bin,Ma Yu,Wu Yufu. Investigation of severe debris flow hazards in Wenjia Gully od Sichuan Province after the Wenchuan earthquake.Journal of Engineering Geology, 2010, 18 (6): 827~836.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3696) PDF downloads(1632) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint