Volume 10 Issue S1
Nov.  2011
Turn off MathJax
Article Contents
ZHAO Duijia, MAO Xinhu, MAO Yanlong. 2002: APPLYING FOR. FORECASTING THE RATE OF TAPHROGENIC DIFFEREN-TIAL SETTLEMENT OF A CITY WITH 2D-σ PROGRAM. JOURNAL OF ENGINEERING GEOLOGY, 10(S1): 210-216.
Citation: ZHAO Duijia, MAO Xinhu, MAO Yanlong. 2002: APPLYING FOR. FORECASTING THE RATE OF TAPHROGENIC DIFFEREN-TIAL SETTLEMENT OF A CITY WITH 2D-σ PROGRAM. JOURNAL OF ENGINEERING GEOLOGY, 10(S1): 210-216.

APPLYING FOR. FORECASTING THE RATE OF TAPHROGENIC DIFFEREN-TIAL SETTLEMENT OF A CITY WITH 2D-σ PROGRAM

  • Received Date: 2002-06-30
  • Publish Date: 2002-12-25
  • The process of taphrogenic differential settlement can be regarded as limited system. The authors in this paper,based on dynamic characteristics of taphrogenic differential settlement in geological skilled works' school, Xi'an city, by means of two-dimension limited system theory, processes monitor data and forecasts life circle or life span of settlement.The paper analyzes the affect of taphrogenic differential settlement 45 years later, which come from forecast, on subway tunnel, simulates it which limited system theory incomputer, and make a conclusion of that taphrogenic differential settlement will break subway tunnel 45 years later. Therefore, we must adopt effective measure to limit exploitation of deep pressing groundwater, and strengthen the construction technology and materials of subway tunnel. Thus we can ensure subway move smoothly tomorrow. The paper furnishes the reference material for building subway and it's running.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (20443) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint