LIU Yong, YUAN Honghu, WANG Zhiyin, WANG Deyun, GONG Xiaoming. 2011: PARAMETER BACK ANALYSIS AND SAFETY IMPACT EVALUATION OF SHALLOW HYDRAULIC TUNNEL. JOURNAL OF ENGINEERING GEOLOGY, 19(6): 902-908.
Citation: LIU Yong, YUAN Honghu, WANG Zhiyin, WANG Deyun, GONG Xiaoming. 2011: PARAMETER BACK ANALYSIS AND SAFETY IMPACT EVALUATION OF SHALLOW HYDRAULIC TUNNEL. JOURNAL OF ENGINEERING GEOLOGY, 19(6): 902-908.

PARAMETER BACK ANALYSIS AND SAFETY IMPACT EVALUATION OF SHALLOW HYDRAULIC TUNNEL

  • Received Date: 2011-01-05
  • Rev Recd Date: 2011-10-24
  • Publish Date: 2011-12-25
  • In order to know the mechanical effect and the stability of the adjacent gas pipeline,the optimum elastic modulus scheme of the loose soil,grouting reinforcement soil and primary support are back-analyzed with utilization of the orthogonal experiment design and on the basis of in-situ measured deformation.The safety impact evaluation on the gas pipeline during the construction process of the hydraulic tunnel are carried out with the back-calculated optimum parameters.The results show that the elastic modulus values for the primary support,the grouting reinforcement soil and the loose soil are 26000MPa, 50MPa and 40MPa,respectively.The adjacent gas pipeline was safe and stable during the construction process of the hydraulic tunnel.
  • loading
  • [1] 郝哲, 万明富,刘斌,等.韩家岭隧道围岩物理力学参数反分析[J].东北大学学报(自然科学版), 2005, 26 (3): 300~303. Hao Zhe,Wan Mingfu,Liu Bin,et al.Backward analysis of physical and mechanical parameters of surrounding rock of Hanjialing tunnel.Journal of Northeastern University(Natural Science), 2005, 26 (3): 300~303.

    [2] 叶飞, 丁文其,朱合华,等.公路隧道现场监控量测及信息反馈[J].长安大学学报(自然科学版), 2007, 27 (5): 79~83. Ye Fei,Ding Wenqi,Zhu Hehua,et al.Site mon-itoring and information feedback of highway tunnel.Journal of Changan University(Natural Science), 2007, 27 (5): 79~83.

    [3] 张孟喜, 李钢,冯建龙,等.双连拱隧道围岩变形有限元与BP神经网络耦合分析[J].岩土力学, 2008, 29 (5): 1243~1248. Zhang Mengxi,Li Gang,Feng Jianlong,et al.Coupling analysis of surrounding rocks in double-arch tunnel by Fe and BP neural networks.Rock and Soil Mechanics, 2008, 29 (5): 1243~1248.

    [4] 吴昊, 张子新,徐营.优化反演理论在隧道围岩参数反演中的应用[J].地下空间与工程学报, 2007, 3 (6): 1162~1167. Wu Hao,Zhang Zixin,Xu Ying.Application of the theory of optimization back analysis in back analysis of tunnel surrounding rock parameters.Chinese Journal of Underground Space and Engineering, 2007, 3 (6): 1162~1167.

    [5] 陈敬松, 李永盛.浅埋连拱隧道围岩参数反演及施工数值模拟[J].地下空间与工程学报, 2007, 3 (6): 1176~1181. Chen Jingsong,Li Yongsheng.Displacement back analysis of shallow double-arch tunnel and its numerical simulation of construction process.Chinese Journal of Underground Space and Engineering, 2007, 3 (6): 1176~1181.

    [6] 朱珍德, 杨喜庆,郝振群,等.基于粒子群优化BP神经网络的隧道围岩位移反演分析[J].水利与建筑工程学报, 2010, 8 (4): 16~20. Zhu Zhende,Yang Xiqing,Hao Zhenqun,et al. Research on displacement back-analysis of tunnel surrounding rock based on bp neural network optimized by particle swarm.Journal of Water Resources and Architectural Engineering, 2010, 8 (4): 16~20.

    [7] 马为功, 李德武,马小虎.基于Matlab神经网络工具箱的隧道位移反分析研究[J].兰州交通大学学报, 2010, 29 (4): 84~87. Ma Weigong,Li Dewu,Ma Xiaohu.The displacement back analysis of tunnel based on matlab neural network toolbox.Journal of Lanzhou Jiaotong University, 2010, 29 (4): 84~87.

    [8] 孙钧, 戚玉亮.隧道围岩稳定性正算反演分析研究[J].岩土力学, 2010, 31 (8): 2353~2360. Sun Jun,Qi Yuliang.Normal calculation-back analysis of surrounding rock stability of subsee tunnel.Rock and Soil Mechanics, 2010, 31 (8): 2353~2360.

    [9] 李治广, 董昕,马健.反分析法与室内试验法确定岩质边坡结构面抗剪强度对比研究——以西柏坡纪念馆不稳定斜坡为例[J].工程地质学报, 2009, 17 (4): 569~573. Li Zhiguang,Dong Xin,Ma Jian.Case study of instable slope at Xibaipo memorial for discontinuity shear strength with back analysis and laboratory test.Journal of Engineering Geology, 2009, 17 (4): 569~573.

    [10] 赵旭峰, 王春苗.厦门海底隧道围岩稳定动态反演分析[J].工程地质学报, 2007, 15 (2): 228~232. Zhao Xufeng,Wang Chunmiao.Dynamic displacement back-analysis on stability of surrounding rocks along xiamen subsea tunnel.Journal of Engineering Geology, 2007, 15 (2): 228~232.

    [11] 刘镇, 房明,周翠英,等.交叉隧道施工中新建隧道周围复合地层与间距对既有隧道的沉降影响研究[J].工程地质学报, 2010, 18 (5): 736~741. Liu Zhen,Fang Ming,Zhou Cuiying,et al. Influence of mix ground and space around new tunnel on existing tunnel settlement during crossing shield construction.Journal of Engineering Geology, 2010, 18 (5): 736~741.

    [12] 北京市水利规划设计研究院. 北京市南水北调配套工程南干渠工程初步设计报告 .北京:北京市水利规划设计研究院, 2009. Beijing Institute of Water.Initial Design Report of the Southern Main Canal Project of Beijing Matching Engineering of South-to-North Water Diversion.Beijing:Beijing Institute of Water, 2009.

    [13] 北京市水利规划设计研究院. 北京市南水北调配套工程南干渠工程试验段工程松散土层中水工隧洞支护技术与围岩变形规律 .北京:北京市水利规划设计研究院, 2010. Beijing Institute of Water.Research on Support Technology and Deformation Law of Surrounding Rock for Hydraulic Tunnel in Loose Soil of the Southern Main Canal Project of Beijing Matching Engineering of South-to-North Water Diversion.Beijing:Beijing Institute of Water, 2010.

    [14] 郑颖人, 沈珠江,龚晓南.岩土塑性力学原理[M].北京:中国建筑工业出版社, 2002: 51~61. Zheng Yingren,Shen Zhujiang,Gong Xiaonan.The Principles of Geotechnical Plastic Mechanics.Beijing:China Architecture & Building Press, 2002: 51~61.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3209) PDF downloads(711) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint