NIU Yanbo, HU Xiewen, LUO Gang, GU Chengzhuang. 2013: EFFECT OF PORE WATER PRESSURE ON SET-OUT RANGE OF HIGH SPEED LANDSLIDE OF ERMANSHAN IN HANYUAN CITY. JOURNAL OF ENGINEERING GEOLOGY, 21(1): 69-75.
Citation: NIU Yanbo, HU Xiewen, LUO Gang, GU Chengzhuang. 2013: EFFECT OF PORE WATER PRESSURE ON SET-OUT RANGE OF HIGH SPEED LANDSLIDE OF ERMANSHAN IN HANYUAN CITY. JOURNAL OF ENGINEERING GEOLOGY, 21(1): 69-75.

EFFECT OF PORE WATER PRESSURE ON SET-OUT RANGE OF HIGH SPEED LANDSLIDE OF ERMANSHAN IN HANYUAN CITY

Funds:

  • Received Date: 2012-05-14
  • Rev Recd Date: 2012-11-07
  • Publish Date: 2013-02-25
  • Because the lock segment can suddenly snip during the process of high speed landslide in the set-out range, the shearing stress is also suddenly released, which can make the pore water pressure near the sliding zone sharply increase. Therefore it greatly reduces the effective stress and makes the landslide has a very high initial velocity. Taking the Ermanshan landslide as example, this paper employs the field survey, laboratory test and theoretical research methods to study such mechanism. The pore water pressure can be affected by the degree of crushing of slip soil particles, which is analyzed. The condition of producing high pore water pressure when landslide starting is given. On the foundation of theoretical research, it shows that the landslide at Ermanshan site has the condition of producing the high pore water pressure through the exploration. By applying the theory of soil mechanics and the results of mechanics of materials, it can conclude the formula of the pore water pressure in the starting-up of the high speed landslide, and the pore water pressure of Ermanshan landslide are computed by this formula. Furthermore it can deeply investigate the pore water pressure effect in the starting-up of the landslide.
  • loading
  • [1] 张明, 殷跃平,吴树仁,等.高速远程滑坡-碎屑流运动机理研究发展现状与展望[J].工程地质学报, 2010, 18 (6): 805~817.

    Zhang Ming, Yin Yueping, Wu Shuren, et al. Development status and prospects of studies on kinematics of long runout rock avalanches. Journal of Engineering Geology, 2010, 18 (6): 805~817.

    [2] 黄润秋, 裴向军,李天斌.汶川地震触发大光包巨型滑坡基本特征及形成机理分析[J].工程地质学报, 2008, 16 (6): 730~741.

    Huang Runqiu, Pei Xiangjun, Li Tianbin.Basic characteristics and formation mechanism of the largest scale landslide at dagungbao occurred during the wenchuan earthquake. Journal of Engineering Geology, 2008, 16 (6): 730~741.

    [3] 王涛, 石菊松,吴树仁,等.汶川地震触发文家沟高速远程滑坡-碎屑流成因机理分析[J].工程地质学报, 2010, 18 (5): 631~644.

    Wang Tao, Shi Jusong, Wu Shuren, et al. Formation mechanism of wenjiagou high-speed and long-runout debris avalanche triggered by Wenchuan earthquake. Journal of Engineering Geology, 2010, 18 (5): 631~644.

    [4] Legros.the mobility of long-runout of landslides. Engineering Geology, 2002, 63:301.

    [5] 胡厚田, 杨明.头寨大型高速远程滑坡流体动力学机制的分析研究[J].工程地质学报, 2000, 8 (增): 85.

    Hu Houtian, Yang Ming. A study on hydrokinetics mechanism of the Touzhai landslide. Journal of Engineering Geology, 2000, 8 (S): 85.

    [6] 邢爱国, 高广运,陈龙珠,等.大型高速滑坡启程流体动力学机理研究[J].岩石力学与工程学报, 2004, 23 (4): 607~613.

    Xing Aiguo, Gao Guangyun, Chen Longzhu, et al. Study on hydrodynamic mechanism of large high-speed landslide in the set-out range. Chinese Journal of Rock Mechanics and Engineering, 2004, 23 (4): 607~613.

    [7] 许强, 董秀军,邓茂林,等.2010年7·27四川汉源二蛮山滑坡-碎屑流特征与成因机理研究[J].工程地质学报, 2010, 18 (5): 609~622.

    Xu Qiang, Dong Xiujun, Deng Maolin, et al. The Ermanshan rock slide-debris flow of July 27, 2010 in Hanyuan, Sichuan: Characteristics and failure mechanism. Journal of Engineering Geology, 2010, 18 (5): 609~622.

    [8] 薛禹群. 地下水动力学[M].北京: 地质出版社, 1997.

    Xue Yuqun. Groundwater Dynamics. Beijing: Geological Publishing House, 1997.

    [9] 胡厚田, 邢爱国,白志勇,等.高速远程滑坡流体动力学理论的研究[M].成都:西南交通大学出版社, 2003.

    Hu Houtian, Xing Aiguo, Bai Zhiyong, et al. Study on Hydrokinetics Theory of Highspeed and Long Runout Landslide. Chengdu: Southwest Jiaotong University Press, 2003.

    [10] Sassa K.A new intelligent type dynamic loading ringshear apparatus. Landslide News(Japanese Land-slide Society), 1997,(10): 33.

    [11] Sassa K,Fukuoka H,Scarascia-Mugnozza G,et al. Earthquake-induced landslides: Distribution motion and mechanisms. Soil and Foundations, 1996,(Special Issue for the Great Hanshin Earthquake Disasters): 53~64.

    [12] 汪发武. 高速滑坡形成机制: 土粒子破碎导致超孔隙水压力的产生[J].长春科技大学学报, 2001, 31 (1): 64~69.

    Wang Fawu. Mechanism of rapid landslides: Excess pore pressure generation caused by grain crushing. Journal of Changchun University of Science and Technology, 2001, 31 (1): 64~69.

    [13] 卢廷浩. 土力学[M].南京:河海大学出版社, 2005.

    Lu Tinhao. Soil Mechanics. Nanjing: Hehai University Press, 2005.

    [14] 邢爱国, 殷跃平.云南头寨滑坡全程流体动力学机理分析[J].同济大学学报(自然科学版), 2009, 37 (4): 481~485.

    Xing Aiguo, Yin Yueping. Whole course analysis on hydrokinetics mechanism of Touzhai gully landslide. Journal of Tongji University(Natural Science), 2009, 37 (4): 481~485.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3613) PDF downloads(627) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint