[1] 余斌,洪勇,何淑芬.降雨泥石流预报的研究[J].水土保持学报, 2002, 16 (6): 96~99. Yu Bin, Hong Yong, He Shufen. Research on forecast of debris flow under rainfall. Journal of Soil Water Conservation, 2002, 16 (6): 96~99.[2] 崔鹏,杨坤,陈杰.前期降雨对泥石流形成的贡献——以蒋家沟泥石流形成为例[J].中国水土保持科学, 2003, 1 (1): 11~15. Cui Peng, Yang Kun, Chen Jie. Relationship between occurrence of debris flow and antecedent precipitation: Taking the Jiangjia gully as an example. Science of Soil and Water Conservation, 2003, 1 (1): 11~15.[3] 王裕宜,邹仁元,李昌志.泥石流土体侵蚀与始发雨量的相关性研究[J].土壤侵蚀与水土保持学报, 1999, 5 (6): 34~38. Wang Yuyi, Zou Renyuan, Li Changzhi. Study on relationship between erosion of debris flows and critical rain quantity. Journal of Soil Erosion and Soil and Water Conservation, 1999, 5 (6): 34~38.[4] 汤家法.蒋家沟泥石流激发土壤水分条件的模拟与分析[J].地质灾害与环境保护, 2009, 20 (3): 90~95. Tang Jiafa. The simulation and analysis of soil water conditions of the debris flow events in the Jiangjia ravine. Journal of Geological Hazards and Environment Preservation, 2009, 20 (3): 90~95.[5] Coussot D. Mudflow Rheology and Dynamics[M]. Balkema: Rotterdam, 1997.[6] 戴福初,李焯芬,黄志全,等.火山岩坡残积土地区暴雨滑坡泥石流的形成机理[J].工程地质学报, 1999, 7 (2): 147~153. Dai Fuchu, Cf Lee, Huang Zhiquan, et al. Mechanism for rainstorm induced soil slide-debris flows in area with volcanic rock derived soils. Journal of Engineering Geology, 1999, 7 (2): 147~153.[7] 何文社, 曹叔尤,刘兴年,等.泥沙起动临界切应力研究[J].力学学报, 2003, 35 (3): 326~331. He Wenshe, Cao Shuyou, Liu Xingnian, et al. Critical shear stress of incipient motion of sediment. Acta Mechanica Sinica, 2003, 35:(3): 326~331.[8] 何文社, 曹叔尤,袁杰,等.斜坡上非均匀沙起动条件初探[J].水力发电学报, 2004, 23 (4): 78~81. He Wenshe, Cao Shuyou, Yuan Jie, et al. Incipient motion of non-uniform sediment particles on sloping fluvial beds. Journal of Hydroelectric Engineering, 2004, 23 (4): 78~81.[9] 陈异植, 庄希澄.饱和坡面流运动波解初探[J]. 福州大学学报, 1987,(3): 55~61. Chen Yizhi, Zhuang Xicheng. Preliminary approach to the solution for the kinematic wave of saturation overland flow. Journal of Fuzhou University, 1987,(3): 55~61.[10] 乔建平, 田宏岭,石莉莉,等.采用危险指数法研究达县特大型暴雨滑坡发育特征[J].山地学报, 2008, 26 (6): 739~744. Qiao Jianping, Tian Hongling, Shi Lili, et al. Applied risk index method to research the characters of Qingning town rainstorm landslide, Daxian, Sichuan, China. Journal of Mountain Science, 2008, 26 (6): 739~744.[11] 智晶子, 王运生,韩丽芳,等. 四川省都江堰龙池甘沟泥石流特征及危险性分析[J].中国地质灾害与防治学报, 2010, 21 (4): 52~56. Zhi Jingzi, Wang Yunsheng, Han Lifang, et al. Risk analysis and features of Gangou' debris flow in Longchi, Dujiangyan of Sichuan province. The Chinese Journal of Geological Hazard and Control, 2010, 21 (4): 52~56.[12] 马煜, 余斌,吴雨夫,等. 四川都江堰龙池"8·13"八一沟大型泥石流灾害研究[J]. 四川大学学报(工程科学版), 2011, 43 (1): 92~98. Ma Yu, Yu Bin, Wu Yufu, et al. Research on the disaster of debris flow of Bayi gully, Longchi, Dujiangyan, Sichuan on August 13, 2010.Journal of Sichuan University(Engineering Science Edition), 2011, 43 (1): 92~98.[13] 亓星, 余斌,马煜,等.四川省都江堰龙池"8·13"麻柳沟泥石流灾害特征[J].中国地质灾害与防治学报, 2011, 22 (1): 17~21. Qi Xing, Yu Bin, Ma Yu, et al. Characteristics of Longchi 8.13 Maliu gully debris flow disasters of in Dujiangyan, Sichuan province. The Chinese Journal of Geological Hazard and Control, 2011, 22 (1): 17~21.[14] 四川省地质工程勘察院. 都江堰市龙池镇水打沟泥石流应急勘查报告.成都: 2010. Geological Engineering Investigation Institute of Sichuan Province. Emergency Exploration Report of Shuida Gully, Dujiangyan. Chengdu: 2010.[15] 余斌. 不同容重的泥石流淤积厚度计算方法研究[J].防灾减灾工程学报, 2010, 30 (2): 207~211. Yu Bin. Study on the method for deposition depth calculation of debris flow with different densities. Journal of Disaster Prevention and Mitigation Engineering, 2010, 30 (2): 207~211.[16] 余斌. 根据泥石流沉积物计算泥石流容重的方法研究[J].沉积学报, 2008, 26 (5): 789~796. Yu Bin. Research on the calculating density by the deposit of debris flows. Acta Sedimentologica Sinica, 2008, 26 (5): 789~796.[17] 朱首明. 土力学(第二版)[M].北京:中国建筑工业出版社, 2005, 86~105. Zhu Shouming. Soil Mechanics(Second Edition).Beijing: China Architectural & Buildings Press, 2005, 86~105.[18] 钱宁, 万兆惠.泥沙运动力学[M].北京:科学出版社, 2003. Qian Ning, Wan Zhaohui. Sediment Movement Mechanics. Beijing: Science Press, 2003.[19] 苪孝芳. 水文学原理[M].南京:河海大学出版社, 2004, 259~323. Rui Xiaofang. Hydrology Principle. Nanjing: Hehai University Press, 2004, 259~323.[20] 何思明,吴永,李新坡. 黏性泥石流沟道侵蚀启动机制研究[J].岩土力学, 2007, 28 (增刊): 155~159. He Siming, Wu Yong, Li Xinpo. Research on eroded start mechanism of channel debris flow. Rock and Soil Mechanics, 2007, 28 (S): 155~159.[21] 张倬元,王士天, 王兰生,等. 工程地质分析原理[M].北京:地质出版社, 1993, 271~275. Zhang Zhuoyuan, Wang Shitian, Wang Lansheng, et al. Engineering Geology Analysis Principle. Beijing: Geological Publishing House, 1993, 271~275.[22] Berti M, Simoni A. Experimental evidences and numerical modeling of debris flow initiated by channel runoff[J]. Landslides, 2005,(2): 171~182.[23] 田凯, 李小青,申震洲,等.不同床沙下的坡面流水力学特性试验研究[J].水土保持学报, 2010, 24 (2): 70~73. Tian Kai, Li Xiaoqing, Shen Zhenzhou, et al. Experimental study on hydraulic characteristic of shallow flow under different bed material. Journal of Soil and Water Conservation, 2010, 24 (2): 70~73.[24] Tecca P R, Genevois R. Field observations of the June 30, 2001 debris flow at Acquabona(Dolomites, Italy)[J].Landslides, 2009, 6 (1): 39~45.[25] Berti M, Genevoisb R, Simoni A M,et al. Field observations of a debris flow event in the Dolomites[J]. Geomorphology, 1999, 29: 265~274.[26] 张小娜, 冯杰,高永波,等. 不同雨强条件下坡度对坡地产汇流及溶质运移的影响[J].水土保持通报, 2010, 30 (2): 119~123. Zhang Xiaona, Feng Jie, Gao Yongbo, et al. Influences of slope on runoff and concentration and solute transport under different rainfall intensities. Bulletin of Soil and Water Conservation, 2010, 30 (2): 119~123.[27] 文科军, 王礼先,谢宝元,等. 暴雨泥石流实时预报的研究[J].北京林业大学学报, 1998, 20 (6): 59~64. Wen Kejun, Wang Lixian, Xie Baoyuan, et al. Real time forecast of storm caused debris flow. Journal of Beijing Forestry University, 1998, 20 (6): 59~64.[28] 王礼先, 朱金兆.水土保持学[M].北京:中国林业出版社, 2005, 126~127. Wang Lixian, Zhu Jinzhao. Soil and Water Conservation Science. Beijing: China Forestry Publishing House, 2005, 126~127.[29] 白永峰, 魏鸿.成昆铁路暴雨泥石流灾害预测模型的研究[J].中国地质灾害与防治学报, 1998, 9 (4): 74~80. Bai Yongfeng, Wei Hong. Study of prediction model on debris flow caused by storm along the Chengdu Kunming railway. The Chinese Journal of Geological Hazard and Control, 1998, 9 (4): 74~80.[30] 四川省地质工程勘察院. 都江堰市龙池镇"8·13"灾后麻柳沟泥石流应急勘查报告书.成都: 2011. Geological Engineering Investigation Institute of Sichuan Province. Maliu Gully "8·13" Post-Disaster Emergency Exploration Report. Chengdu: 2011.
|