[1] 尹健民,艾凯,刘元坤,等.钻孔弹模法评价小湾水电站坝基岩体卸荷特征[J].长江科学院院报, 2006, 23 (4): 44~46. Yin Jianmin, Ai Kai, Liu Yuankun, et al. Unloading characteristic evaluation of Xiaowan hydropower station’s foundation rock mass by borehole elasticity modulus method. Journal of Yangtze River Scientific Research Institute, 2006, 23 (4): 44~46.[2] Duan Shaohui,Ren Qingwen, Chen Junpeng, et al. Study on the performance of arch dam influenced by relaxation of the foundations following excavation[J]. Science China (Technological Sciences), 2011, 54 (5): 1177~1182.[3] 林锋,黄润秋,蔡国军.小湾拱坝坝基开挖卸荷松弛岩体工程特性研究[J].工程地质学报, 2009, 17 (5): 606~611. Lin Feng, Huang Runqiu, Cai Guojun. Experimental study for unload ing and relaxation of dambase during excavation at Xiaowan hydropower station. Journal of Engineering Geology, 2009, 17 (5): 606~611.[4] DL5108-1999. 混凝土重力坝设计规范[S]. 上海:上海科学普及出版社,2000. DL5108-1999. Design Specification for Concrete Gravity Dams[S]. Shanghai: Shanghai Popular Science Press, 2000.[5] 朱焕春. 某高边坡岩体声波测试与分析[J].岩石力学与工程学报, 1999, 18 (4): 378~381. Zhu Huanchun. Sonic wave measuring and analysis of high rock slope. Chinese Journal of Rock Mechanics and Engineering, 1999, 18 (4): 378~381.[6] 韦玮.锦屏一级水电站坝基岩体松弛特征初步研究[D].成都:成都理工大学, 2010. Wei Wei. Rock Relaxation Preliminary Study on the Dam Bedrock of Jinping One-Level Hydropower Station. Chengdu: Chengdu University of Technology, 2010.[7] 李晓,聂德新,万宗礼,等.公伯峡电站开挖边坡古风化岩松弛与工程特性变化研究[J].工程地质学报, 2005, 13 (2): 155~159. Li Xiao, Nie Dexin, Wan Zongli, et al. Study on relaxation and change in engineering characteristic of the rock paleo-weathered after slope excavated. Journal of Engineering Geology, 2005, 13 (2): 155~159.[8] 陈正峰,张勇.坝基开挖产生的爆破松弛带厚度确定[J].地质灾害与环境保护, 2007, 18 (3): 47~50. Chen Zhengfeng, Zhang Yong. The determination of relaxation zone thickness caused by foundation excavation. Journal of Geological Hazards and Environment Preservation, 2007, 18 (3): 47~50.[9] GB50287-2006,水利发电工程地质勘察规范[S]. 北京:中国计划出版社,2008. GB50287-2006,Code for Hydropower Engineering Geological Investigation[S]. Beijing: China Planning Press, 2008.[10] 巨广宏.黄河拉西瓦水电站深切河谷花岗岩体风化卸荷的工程地质研究[D].成都:成都理工大学, 2002. Ju Guanghong. Engineering Geology Study on Weathered & Unloaded Grante Rock Mass Inincised Valley of Yellow River Liver Laxiwa Hydroelectric Station. Chengdu: Chengdu University of Technology, 2002.
|