Volume 22 Issue 1
Feb.  2014
Turn off MathJax
Article Contents
DUAN Xueqin, REN Guangming, XIA Min, WAN Zongli, MA Fuxiang, JI Faqiang, HE Qingrong. 2014: ROCK RELAXATION CHARACTERISTICS OF LAYERED FOUNDATION ROCK MASS FOR HYDROPOWER STATION IN SOUTHWEST REGION. JOURNAL OF ENGINEERING GEOLOGY, 22(1): 124-129.
Citation: DUAN Xueqin, REN Guangming, XIA Min, WAN Zongli, MA Fuxiang, JI Faqiang, HE Qingrong. 2014: ROCK RELAXATION CHARACTERISTICS OF LAYERED FOUNDATION ROCK MASS FOR HYDROPOWER STATION IN SOUTHWEST REGION. JOURNAL OF ENGINEERING GEOLOGY, 22(1): 124-129.

ROCK RELAXATION CHARACTERISTICS OF LAYERED FOUNDATION ROCK MASS FOR HYDROPOWER STATION IN SOUTHWEST REGION

Funds:

  • Received Date: 2013-05-15
  • Rev Recd Date: 2013-10-15
  • Publish Date: 2014-02-25
  • Relaxation and its relaxation zone of excavated foundation rock mass is a kind of common phenomenon in hydropower project. They have important influence on the foundation rock mass quality. The foundation rock mass after excavation is bound to produce new blasting cracks along with the excavation unloading and stress release. Although it has not been further weathered, rock mass can form a relaxation zone in the superficial depth, with its relaxation and unloading. Therefore, determination of relaxation zone thickness is of great significance in engineering. The paper is based on the field of geological environment condition survey and acoustic test and the indoor synthetic analysis. It studies a relaxation zone thickness and characteristics of layered foundation rock mass and analyze the foundation rock causes of deep relaxation. On the basis, it analyses the relaxation zone that has influence on the engineering properties of the foundation rock, which has instructive function for dam foundation excavation practice of similar projects.
  • loading
  • [1] 尹健民,艾凯,刘元坤,等.钻孔弹模法评价小湾水电站坝基岩体卸荷特征[J].长江科学院院报, 2006, 23 (4): 44~46. Yin Jianmin, Ai Kai, Liu Yuankun, et al. Unloading characteristic evaluation of Xiaowan hydropower station’s foundation rock mass by borehole elasticity modulus method. Journal of Yangtze River Scientific Research Institute, 2006, 23 (4): 44~46.

    [2] Duan Shaohui,Ren Qingwen, Chen Junpeng, et al. Study on the performance of arch dam influenced by relaxation of the foundations following excavation[J]. Science China (Technological Sciences), 2011, 54 (5): 1177~1182.

    [3] 林锋,黄润秋,蔡国军.小湾拱坝坝基开挖卸荷松弛岩体工程特性研究[J].工程地质学报, 2009, 17 (5): 606~611. Lin Feng, Huang Runqiu, Cai Guojun. Experimental study for unload ing and relaxation of dambase during excavation at Xiaowan hydropower station. Journal of Engineering Geology, 2009, 17 (5): 606~611.

    [4] DL5108-1999. 混凝土重力坝设计规范[S]. 上海:上海科学普及出版社,2000. DL5108-1999. Design Specification for Concrete Gravity Dams[S]. Shanghai: Shanghai Popular Science Press, 2000.

    [5] 朱焕春. 某高边坡岩体声波测试与分析[J].岩石力学与工程学报, 1999, 18 (4): 378~381. Zhu Huanchun. Sonic wave measuring and analysis of high rock slope. Chinese Journal of Rock Mechanics and Engineering, 1999, 18 (4): 378~381.

    [6] 韦玮.锦屏一级水电站坝基岩体松弛特征初步研究[D].成都:成都理工大学, 2010. Wei Wei. Rock Relaxation Preliminary Study on the Dam Bedrock of Jinping One-Level Hydropower Station. Chengdu: Chengdu University of Technology, 2010.

    [7] 李晓,聂德新,万宗礼,等.公伯峡电站开挖边坡古风化岩松弛与工程特性变化研究[J].工程地质学报, 2005, 13 (2): 155~159. Li Xiao, Nie Dexin, Wan Zongli, et al. Study on relaxation and change in engineering characteristic of the rock paleo-weathered after slope excavated. Journal of Engineering Geology, 2005, 13 (2): 155~159.

    [8] 陈正峰,张勇.坝基开挖产生的爆破松弛带厚度确定[J].地质灾害与环境保护, 2007, 18 (3): 47~50. Chen Zhengfeng, Zhang Yong. The determination of relaxation zone thickness caused by foundation excavation. Journal of Geological Hazards and Environment Preservation, 2007, 18 (3): 47~50.

    [9] GB50287-2006,水利发电工程地质勘察规范[S]. 北京:中国计划出版社,2008. GB50287-2006,Code for Hydropower Engineering Geological Investigation[S]. Beijing: China Planning Press, 2008.

    [10] 巨广宏.黄河拉西瓦水电站深切河谷花岗岩体风化卸荷的工程地质研究[D].成都:成都理工大学, 2002. Ju Guanghong. Engineering Geology Study on Weathered & Unloaded Grante Rock Mass Inincised Valley of Yellow River Liver Laxiwa Hydroelectric Station. Chengdu: Chengdu University of Technology, 2002.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (2758) PDF downloads(795) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint