ANALYSIS OF INSITU GEOSTRESS AND ROCKBURST |AT NO.2 VENTILATION SHAFT TUNNEL OF QINLING HIGHWAY TUNNEL
-
Graphical Abstract
-
Abstract
The No.2 ventilation shaft of Qinling highway tunnel is mainly located in the mixed gneiss stratum. The main technical problems encountered in the shaft excavation are high insitu geostress and rockburst. The paper examined the engineering geology of the shaft and the geostress measurement results of nearby engineering by hydraulic fracturing method. Then, the geostress field in the shaft area is calculated and regressed with 3D finite element method. It is shown that the geostress in the shaft area has a high horizontal geological structure stress and is ly distributed in zones. The maximum horizontal geostress is 28.7 MPa. The vertical geostress is controlled by weight of rockmass. Based on the geostress field, the rockburst prediction in the shaft is made according to the Tao's rockburst criteria. The depth of rockburst failure area is estimated with the constantdeviatoricstresscriterion of brittle rock mass. The results show that there are high possibilities of occurring weak and moderate rockbursts. The maximum depth of failure is 0.6 m in the surrounding rocks of the shaft. The results from the geostress and rockburst analysis are well compared with the actual situations of rockbursts after shaft excavation.
-
-