Citation: | LI Yongqiang, HAN Limin. 2008: ENGINEERING GEOLOGICAL CHARACTERISTIC AND EVALUATION OF PERMAFROST GROUND ALONG QINGHAI-TIBET RAILWAY. JOURNAL OF ENGINEERING GEOLOGY, 16(2): 245-249. |
[1] 牛富俊,张建明,张钊.青藏铁路北麓河试验段冻土工程地质特征及评价
[J].冰川冻土,2002, 24 (3):264~269. Niu Fujun, Zhang Jianming, Zhang Zhao. Engineering geological characteristics and evaluations of permafrost in beiluhe testing field of Qinghai-Tibet Railway. Journal of Glaciology and Geocryology, 2002, 24 (3):264~269. [2] 中铁西北科学研究院有限公司研究报告.青藏铁路多年冻土区工程地质报告 ,2005. Research Report of Northwest Research Institute Co., Ltd. of China Railway Engineering Corporation. Engineering Geological Report of Permafrost in the Qinghai-Tibet Railway,2005. [3] 铁道第一勘察设计院等.青藏铁路多年冻土区工程勘察暂行规定 [S],2001. The First Survey and Design Institute of China Railway Construction Corporation, et al.. Temporary prescript for engineering surveying of permafrost in the Qinghai-Tibet Railway,2001. [4] 中国科学院寒区旱区环境与工程研究所冻土工程国家重点实验室研究报告.青藏铁路试验工程冻土工程地质报告 ,2001. Research Report of State Key Laboratory of Frozen Soil Engineering, CAREERI, CAS. Engineering geological research report of permafrost in testing engineering of Qinghai-Tibet Railway, 2001. [5] 程国栋.青藏高原多年冻土区路基工程地质研究 [J].第四纪研究,2003, 23 (2):135~141. Cheng Guodong. Research of engineering geology of the roadbed in permafrost regions of Qinghai-Tibet Plateau. Journal of Quaternary Sciences,2003, 23 (2):135~141. [6] 吴云生,张增淮.青藏铁路多年冻土工程地质综合分类探讨 [J].冰川冻土,2003, 25 (suppl.1):1~3. Wu Yunsheng, et al.. Discussion on the composite classification of permafrost engineering geology along the Qinghai-Tibet Railway. Journal of Glaciology and Geocryology, 2003, 25 (suppl.1):1~3. [7] 孟祥连.青藏铁路多年冻土工程地质勘察 [J].铁道勘察,2006,(3):28~31. Meng Xianglian. Engineering geological prospecting of permafrost in the Qinghai-Tibet Railway. Journal of Railway Investigation and Surveying, 2006,(3):28~31. [8] 杨永鹏,杨印海,蒋富强等.青藏铁路清水河试验段冻土工程地质特征及评价 [J].铁道工程学报,2002,(suppl.):19~21. Yang Yongpeng, Yang Yinhai Jiang Fuqiang,et al.. Engineering geological characteristics and evaluations of permafrost in Qingshuhe trial section of Qinghai-Tibet Railway. Journal of Railway Engineering Society, 2002,(suppl.):19~21. [9] 库新勃,董献付,吴青柏.青藏铁路多年冻土区工程复杂性分析 [J].工程地质学报,2007, 15 (6):739~745. Ku Xinbo, et al.. Analyses of the engineering complexities in permafrost regions with the Qinghai-Tibet railway and highway as example. Journal of Engineering Geology, 2007, 15 (6):739~745 |