QIAN Haitao, QIN Siqing, MA Ping. 2006: NONLINEAR MECHANISM OF SLIDING INSTABILITY ALONG WEAK STRUCTURAL SURFACE BELOW GRAVITY DAM FOUNDATION. JOURNAL OF ENGINEERING GEOLOGY, 14(3): 307-313.
Citation: QIAN Haitao, QIN Siqing, MA Ping. 2006: NONLINEAR MECHANISM OF SLIDING INSTABILITY ALONG WEAK STRUCTURAL SURFACE BELOW GRAVITY DAM FOUNDATION. JOURNAL OF ENGINEERING GEOLOGY, 14(3): 307-313.

NONLINEAR MECHANISM OF SLIDING INSTABILITY ALONG WEAK STRUCTURAL SURFACE BELOW GRAVITY DAM FOUNDATION

Funds:

  • Received Date: 2005-09-22
  • Rev Recd Date: 2006-01-05
  • Publish Date: 2006-05-22
  • The incompetent structural plane was actually a combination of two mediums: medium 1 is elasto-brittle or strain-hardening material and medium 2 was strain-softening material,because it has different attribute in different environment or different parts.A cusp catastrophe model is presented to describe the behavior of sliding along one deep incompetent structural plane of a gravity dam foundation,and the sufficient conditions leading to instability are discussed.It is found that the instability of sliding relies mainly on the stiffness ratio k,the homogeneity index of the medium m and the geometry-mechanic parameter and that the reliability of the traditional limit analysis method is deficient.The influence of water fluctuation and prevention project is discussed too.It is indicated that the rising of water of the reservoir enlarges the material homogeneity and hence reduces the stiffness ratio k and that the instability of the dam may be posterior to the time when water comes to its peak.The prevention project enhances the potential of anti-sliding,and also has a new effect on enlarging the stiffness ratio k,which makes the instability of sliding occur more difficultly.
  • loading
  • [1] 王思敬.坝基岩体工程地质力学分析
    [M].北京:科学出版社,1990.W ang S ijing.Engineering G eom echan ics A nalys is of D am Foundat ion R ock.B eijing:S cience Press,1990.

    [2] 张光斗,王光论.水工建筑物(上册)
    [M].北京,水利电力出版社,1992.Zhang G uangdou,W ang G uanglun.H ydrotechn ical Construction(B ook one).Beij ing:W ater C onservan cy and E lectric Pub lish ingH ouse,1992.

    [3] 李仲春.论万家寨坝基夹层抗滑稳定性地质评价
    [J].水利水电工程设计,2001,20(1):1~7.L i Zhongchun.E valuate of an ti-sl id ing stab ility of in terlayer ofW an jiazh ai dam foundat ion.D esign ofW ater R esou rces&H ydroelectric Eng ineering,2001,20(1):1~7.

    [4] 赖国伟,王宏硕,陆述远,等.具有软弱结构面坝基的抗滑稳定分析
    [J].武汉水利电力学院学报,1987,(4):1~10.La i G uow ei, W ang H ongshu o,Lu Shuyuan et al. A nalys is of ant i-s lid ing stabil ity of adam foundation under w h ich there are incom petent stru ctural p lan es.Jou rnal of W uhan U n ivers ity of H y ic and E lectric Eng ineering,1987,(4):1~10.

    [5] 李瓒,龙云霄.重力坝拱坝基础岩体抗滑稳定性分析中一些问题的探讨
    [J].水利学报,2000,(8):39~45.L i Zan,LongY unx iao.D iscu ssion on sl id ing analysis of dam foundation.Journal of H ydrau lic Eng ineering,2000,(8):39~45.

    [6] A zm S.A l-H om oud,N ajat T anash.M odeling uncertainty in stab ility analysis for design of em bankm en t dam s on d iff icu lt foundat ion s
    [J].Engin eering G eology,2004,71,323~342.

    [7] 吴彰敦.坝基深层抗滑极限平衡分析的改进
    [J].红水河.1992,11(2):17~22.W u Zh angdun.Am elioration on deep s lid ing lmi it analysis of damfoundat ion.H ongshu i R iver,1992,11(2):17~22.

    [8] 周创兵,陈益峰.含反倾角结构面的坝基深层滑动模式研究
    [J].岩石力学与工程学报,2003,22(8):1302~1308.Zhong Chuangbin,C hen Y ifeng.S tudy of deep slid ing m odel ofdam rock foundat ion intersected by inversely d ipping d iscon tinu it ies.C h inese Jou rnal of R ock M echan ics and E ng ineering,2003,22(8):1302~1308.

    [9] 钱保国,吴彰敦.坝基深层抗滑稳定可靠度分析蒙特卡罗方法
    [J].红水河,2000,19(4):21~25.Q ian Baoguo,W u Zhangdun.M on te-carlom ethod of analys is onreliab il ity of an ti-s lid ing stab ility for th e deep d am foundat ion.H ongshu i R iver,2000,19(2):21~25.

    [10] 张发明,陈祖煜,张宏亮.坝基三维深层抗滑稳定性分析的极限方法
    [J].辽宁工程技术大学学报,2003,22(6):776~778.Zhang Fam ing,Ch en Zuyu,M iH ong liang.D eep sl id ing stab ilityof dam foundation by using 3D upp er bond m ethod.Journal of L iaon ing Techn ical U n ivers ity,2003,22(6):776~778.

    [11] 何显松,张永,等.重力坝坝基稳定三维地质力学模型试验研究
    [J].四川大学学报(工程科学版),2002,34(2):16~20.H e X iansong,Zh ang Y ong,Zhang L in,et al..S tudy on theD am B ase S tab ility of G ravityD am by th ree-d im ensional G eomech an ical M odel Tes t
    [J].Jou rnal of S ichuan U n iverst ity,2002,(2):16~20.

    [12] 施建新.浅论不同应力状态下坝基层间剪切带弹性力学性质
    [J].水文地质工程地质,1999,(2):45~47.Sh i Jianxin.D iscuss ion on the elast icity p roperty of the shear zoneunder d if feren t stress.H ydrogeology and Engin eering G eology,1999,(2):45~47.

    [13] 孙万和,杨连生.慎乃齐,等.葛洲坝坝基层间剪切带的模拟研究
    [J].武汉水利电力学院学报,1991,24(5):495~502.Sun W anhe,Y ang L iansheng,Sh eng Laiq,i et a.l M odel S tudyof In tercalated Sh ear Zone in G ezgouba D am Foundation.Jou rnalof W uhan U n iversity of Hydraul ic and E lectric Eng ineering,1991,24(5):495~502.

    [14] 施建新.不同施工状态坝基层间剪切带松弛变形机理初探
    [J].水电站设计,2001,17(3):70~72.Sh i J ianx in.D iscuss ion on the relaxation m echan ism of interlayershear zone under d if feren t cons truct ion environm en.tD esign ofH yd ropow er Station,2001,17(3):70~72.

    [15] 范华.张河湾抽水蓄能电站上库坝基软弱夹层稳定性试验研究
    [J].水利水电技术,1997,28(10):5~9.Fan H ua.R esearch of the ant i-shear stab ility of in com peten tstructu ral under dam foundat ion of Zhangh ew an pum p pow er station.W ater R esources and H yd ropow er Engin eering,1997,28(10):5~9.

    [16] 孙广忠.岩体结构力学
    [M].北京:科学出版社,1988.Sun G uangzhong.R ock stru cture m echan ics.B eijing:Science,1988.

    [17] Thom,R..Stab il it structu relle et m orphog n se
    [M].N ewY ork:Ben jam in,1972.

    [18] H en ley,S..Catastrophe theory models in geology
    [J].M athem atical G eology,1976,8(6),649~655.

    [19] S aund ers,P.T..A n in trodu ct ion to catastrophe theory
    [M].London:C am bridgeU n iversity Press,1980.

    [20] K eilis-Borok,V..I.Th e lith osphere of the earth as a non linearsystem w ith mi p lications for earthquake pred iction
    [J].R ev.G eophys.,1990,28,19~34.

    [21] 仪垂祥.非线性科学及其在地学中的应用
    [M].北京:气象出版社,1992.Y i Chu ixiang.N on l inear Scien ces and their A pp licat ion s in G eoscience.B eijing:Ch ina m eteoro log ical Press,1992.

    [22] 秦四清,张倬元,王士天,等.非线性工程地质学导引
    [M].成都:西南交通大学出版社,1993.Q in S iq ing,Zh ang Zhuoyuan.W ang S itian,et a.l.A n in trodu ction to non linear engin eering geology.C hengdu:Sou thw est J iaotong U n iversity Press,1993.

    [23] 秦四清,张倬元,王仕天,等.滑坡时间预报的突变理论及灰色突变理论方法
    [J].工程地质学报,1993,12(4):63~68.Q in S isq ing,et al..The p red ict ion of s lope instab ility by catastrophe th eory and grey catastrophe theory.Jounal of Eng ineeringG eo logy,1993,12(4):63~68.

    [24] 黄润秋,许强.突变理论在工程地质中的应用
    [J].工程地质学报,1993,1(1):65~73.H uang R unqiu,et al..A pp lication of catastroph e theory to engineering geology.Jou rn al of Eng ineering G eo logy,1993,1(1):65~73.

    [25] Ph illip s,J.D..Ins tab il ity and ch aos in h ills lop e evo lut ion
    [J].Am.J.Sci.,1993,293,25~48.

    [26] Ph illip s,J..N on lin ear dynam ics and the evolu tion of relief
    [J].G eomorphology,1995,(14):57~64.

    [27] S iq ing Q in,Jiu J mim y J iao,S ij ing W ang.A cusp catastrophem odel of instab ility of slip-bu ck ling slope
    [J].R ock M echanicsand R ock E ngineering,2001,34(2):119~134.

    [28] S iq ing Q in,J iu Jmim y J iao,S i jingW ang.A N on lin ear Catastroph eM odel of Ins tab il ity of Planar-slip S lope and C haotic D ynam icalM echan ism s of Its Evolu tionary Process
    [J].Intern at ion alJourn al of Solids and S tructu res,2001,(38):8093~8109.

    [29] Tang,C.A..C atastroph e in R ock U nstab le Failu re(in Ch in ese)
    [M].B eijing:Ch in a C oal Indus try Pub lish ing H ouse,1993.

    [30] Lajtai, E.Z..The in fluence of interlock ing rock discon tinu itieson comp ress ive strength(m od el expermi ents)
    [J].Felsm echIngen ieurgeol, 1967,5,217~228.

    [31] G eh le,C.,K u tter,H.K.Breakage and shear beh aviour of interm itten t rock join ts
    [J].In .tJ.R ock M ech.M in.Sc.i,2003,40,687~700.

    [32] Jaeger J.C.,C ook G.W..岩石力学基础
    [M].北京:科学出版社,1983.Jaeger J.C.,Cook G.W.,R ock M echan ics.B eijing:S cien cePress,1983.

    [33] 辛常清,李芳.汾河二库坝基软弱结构面工程地质特征及工程处理
    [J].水电站设计,2002,18(4):85~87.X in C hangq ing,L i Fang.The characters and disposal of incompeten t structu ral under second reservo ir dam foundat ion in Fenherive.rD es ign of H ydropow er S tat ion,2002,18(4):85~87.

    [34] 中华人民共和国水利部.混凝土重力坝设计规范(SL 319-2005)
    [S],2005.M in istry ofW ater R esou rces of P.R.Ch ina.D es ign specificationfor con crete grav ity dam s,2005.

    [35] 张嘉华,徐维国.万家寨水利枢纽坝基层间剪切带处理
    [J].中国水利,2002,38(5):59~60.Zhang Jiahua,X u W eiguo.D isposal of interlayer sh ear zone under W an j iazhai dam foundation.Ch ina W ater R esource,2002,38(5):59~60.

    [36] 秦四清,王思敬.煤柱-顶板系统协同作用的脆性失稳与非线性演化机制
    [J].工程地质学报,2005,13(4):437~446.Q in S iq ing,W ang S i jing.In stab ility leading to rockbu rsts andnon linear evolu t ionary m echan ism s for coal-p illar-and-roofsys tem.Jou rn al of Eng ineering G eology,2005,13(4):437~446.

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (3191) PDF downloads(931) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint